Work completed Tuesday and Wednesday 18-19 May 2021.
This is another on going and busy week.
Tuesday:
* Mountain extension tamp and lift planning (Steve L, Brian W, Nick)
* Tamper (Big Joe) repairs (Jason, Leon, Bill B, Bob L)
* Shop, wheel press (Jerry, Carlos, Alan, Wes C)
* Moving Dirt Pile (Fred)
* Fire Extinguisher Installations (Stewart)
* Tool Shed repair/shingling (Stan & Ralph)
* Excavating Car Barn Drainage (Brendan, Jeff (contractor)
* Alna Center mowing (Randy, Fred)
* Car Barn track leads positioned for installment/bolting (Jeff, Brendan, Steve L, Brian W)
* Engine House footing preparation (Contractor)
* Vacuum Brakes (Jonathan, Randy)
Wednesday:
* Tie and Dine prep, ties loaded/placed (Dan M, Steve L, Chuck, Fred )
* Brookville, work continues (Jay B)
* Tool Shed work continues (Stan, Ralph)
* Track Leads #1 and #2, Joints bolted up (Steve L, Chuck, Dan)
* Dirt Moving (Fred and Stewart)
* Vacuum Brakes (Jonathan, Randy)
* Engine House footings, measuring Etc. (Contractor, sorry unknown name)
* Finale, assembly on Tamper (Bill) Tamper test (Bill, Jay B, Steve L)
* Brendan and Fred were working all over the campus on various things
Notes:
For everyone I missed sorry, what a week it is.
There were various other things going with work being done and visits from
(Dave B, Cindy R, Steve P and Johnny, Roger W.)
Looks as if the Engine House foundation is being poured Thursday.
I expect Brendan and Stewart will elaborate more on special projects.