Work completed Tuesday and Wednesday 27-28 April 2021
Tuesday:
* Bridge work:
New ventilation added to both inside walls. (Randy, Brian W, Chuck, Mark, Steve L)
Bridge inspection/final work plan for bridge completion. (Jason, Steve L)
Bridge insect inspection, outrigger/support bar tightened. Steve L, Chuck Brian W)
* Vacuum brake work, bellows function check (Jonathan, Jay Barta)
* Shop work (Alan, Jerry, Carlos)
* Archives (Linda)
* Gift shop Cindy)
* Model T repairs (Leon, Jacob)
* Helping every where (Fred)
Wednesday:
* Coach #9 Letter boards planed, these boards are 40 feet long.
(Eric, Fred, Brendan, Bryce, Dan, Randy, Leon, Jacob, Steve L, Jason)
* Septic Heights clean up continues (Dan, Bryce)
Note: I left at 10AM Wed. More work may have been done but I was advised both Letter boards
were planed. More work may have been completed during the day.