Work complete Tuesday and Wednesday April 6-7, 2021.
Tuesday:
* Track Work, the run through track was removed, track panel’s stored, ballast stone recovered and
road bed graded. (Brendan, Fred, Steve L, Brian W, Chuck, Dan)
* Septic heights cleaned up, old wood cut up. (Dan, Bryce)
* Vacuum brake work continues (Johnathan, Randy)
* Locomotive #8, oiled, steam chest inspected, switched over to Machine shop, lead #3.
(Jason, Brian F, Bryce, Dan)
* Tamper (Wilma) moved to woods track, various function checks made, electrical issue discovered.
(Jason, Joe F, Steve L, Brian W, Chuck, Goran C, Phil B, Dan)
Wednesday:
* Tamper (Big Joe) maintenance continued, greased, oiled air line repairs. (Steve L, Chuck Leon)
* Truck unloaded with more parts for Locomotive #11, stored in container)
* Survey for the new run through track made, (Randy, Johnathan)
* Septic heights work, wood split loaded/delivered to Alna, old track panels recovered.
(Dan, Brian S, Brendan, Steve L)
* Coach #9 assembly continued (Eric, Ron)
* Tamper (Big Joe) placed on Main for function check and tamping, he is back in service.
(Steve L, Chuck, Dan)
Note: Various members in out today, Steve Z, Steve P, Zack, Stewart, Dave.
Always like to point out that work continues through out the week by members on various
projects.