Work completed Tuesday and Wednesday April 13-14, 2021
Tuesday:
* Rail Inventory Sheepscot yard rail pile. (Steve L, Chuck, Brian W)
* Right of way clean up (South of Sheepscot campus) (Fred)
* Yard switching, prep. for track removal. (Steve L, Chuck, Brian W)
* Surveying (Randy, Jonathan)
* Vacuum brake work (Jonathan, Randy)
* Painting Turner Creamery car. (Stewart)
* Archive work (Linda)
* Dispatch/Event/paper work. (Ed)
Wednesday:
* Track removal to include: Turntable lead, Car Barn Bay leads. (Brendan, Steve L, Chuck, Dan)
* Yard switching and recovery of Flat car #126 from ML&M. (Dan, Bryce)
* Ash removal from Machine shop lead #4. (Fred, Leon and his grandson)
* Ties readied/loaded on flat for April 24 work day. (Dan, Steve L, Chuck)
* New metal blue flag signals, made and placed on Machine shop leads (Leon and grandson)
* Turner Creamery Car painting continues. (Stewart)
Notes: New Notice on Notice board
Apologies to Leon’s grandson, I forgot his name.