Rail supports bolted down in the pit and the rail laid down on the supports.









The roof got a layer of plywood followed by a layer of ice and water shield. Metal roofing is being ordered for the building this week.













Windows and doors going in on the west side.







Shingles being put on above the doors.



Turntable from the roof.


United Timber Bridge Workers, Local 1894, Alna, ME

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,642
    • View Profile
Re: Engine House - Official Work Thread
« Reply #316 on: November 05, 2022, 06:02:32 PM »
Nice to see those windows in. Really makes a difference in appearance.
Mike
Doing way too much to list...

Wayne Laepple

  • Museum Member
  • Yardmaster
  • *******
  • Posts: 2,123
    • View Profile
Re: Engine House - Official Work Thread
« Reply #317 on: November 05, 2022, 08:36:51 PM »
Thanks for the great photos, Brendan. Glad to see the roof is getting finished. And the windows do make a big difference in the appearance of the building. Now for the doors!

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,222
  • Loco for 6
    • View Profile
Re: Engine House - Official Work Thread
« Reply #318 on: November 06, 2022, 02:59:56 PM »
I'm glad Brendan's photos don't show all the wrinkles in the tarpaper!

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,351
    • View Profile
Re: Engine House - Official Work Thread
« Reply #319 on: November 07, 2022, 08:56:49 AM »
I'd say the Sheepscot crew had a very successful weekend. The enginehouse is looking great.

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Dave Crow

  • Museum Member
  • Fireman
  • ****
  • Posts: 389
    • View Profile
Re: Engine House - Official Work Thread
« Reply #320 on: November 07, 2022, 10:06:57 AM »
Great progress on the roof as well as the start on the shingles above the door openings.  Will there be shingles on the faces of the posts, or will they be left bare?  I ask, only because I see some tarpaper overhanging the front face of the west corner post.

Dave Crow

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,222
  • Loco for 6
    • View Profile
Re: Engine House - Official Work Thread
« Reply #321 on: November 07, 2022, 10:08:32 AM »
I put tarpaper over the posts not knowing if it was required or not.

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,065
    • View Profile
Re: Engine House - Official Work Thread
« Reply #322 on: November 07, 2022, 12:23:24 PM »



United Timber Bridge Workers, Local 1894, Alna, ME

John McNamara

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,586
    • View Profile
Re: Engine House - Official Work Thread
« Reply #323 on: November 07, 2022, 08:33:01 PM »
Does the Fred come with the kit or is that optional?

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,065
    • View Profile
Re: Engine House - Official Work Thread
« Reply #324 on: November 07, 2022, 08:54:22 PM »
Great progress on the roof as well as the start on the shingles above the door openings.  Will there be shingles on the faces of the posts, or will they be left bare?  I ask, only because I see some tarpaper overhanging the front face of the west corner post.

Dave Crow

The posts get covered with trim boards. The middle two posts have trim on them at the top.



United Timber Bridge Workers, Local 1894, Alna, ME

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,351
    • View Profile
Re: Engine House - Official Work Thread
« Reply #325 on: November 09, 2022, 02:45:47 PM »
Are all the windows in?

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Gordon Cook

  • Museum Member
  • Engineer
  • ****
  • Posts: 504
  • Board Member 2009-2015
    • View Profile
Re: Engine House - Official Work Thread
« Reply #326 on: November 11, 2022, 08:01:13 AM »
I saw yesterday, the 10th, that the west and north windows were in, but not the east ones.
Start was starting to shingle the west wall.
Compliments to Brendan and the rest of the crew for excellent work!
Gawdon

Stephen Hussar

  • Museum Member
  • Conductor
  • *****
  • Posts: 913
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #327 on: November 11, 2022, 09:16:39 AM »
AMAZING!! Can't wait to see this (and many other things!) in person!!

john d Stone

  • Museum Member
  • Fireman
  • ****
  • Posts: 421
    • View Profile
Re: Engine House - Official Work Thread
« Reply #328 on: November 12, 2022, 10:26:55 PM »
Really looking great!

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,416
  • Life member. Ack.
    • View Profile
Re: Engine House - Official Work Thread
« Reply #329 on: November 23, 2022, 09:23:09 PM »
A couple of Tuesday photos of shingling the west wall.

Fred Morse working on the left, as Stewart Rhine works on the staging on the right.


Paul Richard assists Stewart.
What–me worry?