Author Topic: Engine House - Official Work Thread  (Read 68582 times)

Dave Buczkowski

  • Museum Member
  • Conductor
  • *****
  • Posts: 956
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #285 on: April 10, 2022, 04:58:44 PM »
Methinks it won’t be too long before I join the midweek crew.
Thanks Carl!
Dave

Bob Holmes

  • Museum Member
  • Engineer
  • ****
  • Posts: 742
    • View Profile
Re: Engine House - Official Work Thread
« Reply #286 on: April 10, 2022, 06:58:50 PM »
Me also...

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,051
    • View Profile
Re: Engine House - Official Work Thread
« Reply #287 on: April 11, 2022, 06:54:56 PM »
The roof overhang on the front almost done.



Loading up some lumber for the roof at the sawmill.



United Timber Bridge Workers, Local 1894, Alna, ME

Ted Miles

  • Museum Member
  • Fireman
  • ****
  • Posts: 305
    • View Profile
Re: Engine House - Official Work Thread
« Reply #288 on: May 14, 2022, 12:50:13 PM »
Folks,
          How about an update about the Engine House? It has been since April 11 that anything was posted here. Such a wonderful project!

Ted Miles, Life Member and Built 11 Contributor

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,090
  • Loco for 6
    • View Profile
Re: Engine House - Official Work Thread
« Reply #289 on: May 14, 2022, 05:43:48 PM »
Not much to report - we're waiting on lumber.

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,051
    • View Profile
Re: Engine House - Official Work Thread
« Reply #290 on: June 24, 2022, 03:45:24 PM »
All the roof framing was finished on stall 3 and most of the roof sheathing over stall 3 is complete.









New window openings were framed in the back wall of stall 2 and the office was framed in.





The door header was put up at the back of stall 1 and the wall sheathed.





United Timber Bridge Workers, Local 1894, Alna, ME

john d Stone

  • Museum Member
  • Fireman
  • ****
  • Posts: 412
    • View Profile
Re: Engine House - Official Work Thread
« Reply #291 on: June 25, 2022, 02:09:53 PM »
Wow! That's an amazing amount of work! Looks great!

Kevin Kierstead

  • Museum Member
  • Switchman
  • **
  • Posts: 86
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #292 on: June 25, 2022, 04:08:49 PM »
what's the clearance between the service track and bay #1?
BATLRSBS: Brotherhood of Amalgamated Track Layers, Rail Spikers and Ballast Spreaders; ToM/Trout Brook Chapter

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,090
  • Loco for 6
    • View Profile
Re: Engine House - Official Work Thread
« Reply #293 on: June 25, 2022, 04:15:52 PM »
"Will not clear man on side of car"

Bob Holmes

  • Museum Member
  • Engineer
  • ****
  • Posts: 742
    • View Profile
Re: Engine House - Official Work Thread
« Reply #294 on: June 25, 2022, 05:12:52 PM »
The real test will be #8...

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,301
    • View Profile
Re: Engine House - Official Work Thread
« Reply #295 on: June 27, 2022, 08:21:53 AM »
More progress. It's good to see the roof work continue.

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,359
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #296 on: June 27, 2022, 01:53:48 PM »
In the what goes on behind the scenes for the away crowd department.  Brendon had to run all those rough saw cut roof deck boards thru the new large planer so they would be the same thickness.  That way there would not be steps between some of the boards which would increase the possibility of roof leaks.
~ B2 ~ Wascally Wabbit & Gofer ~

Fred L. Kuhns

  • Museum Member
  • Hostler
  • ***
  • Posts: 222
    • View Profile
Re: Engine House - Official Work Thread
« Reply #297 on: July 04, 2022, 01:53:42 PM »
 I wonder if Brendon ran the boards through the planner S/1 or S/2 ? Really only necessary to make one pass to make all board the same thickness.

Mark Spremulli

  • Museum Member
  • Baggageman
  • **
  • Posts: 143
  • How Do?
    • View Profile
    • Mark Spremulli Photography
Re: Engine House - Official Work Thread
« Reply #298 on: July 08, 2022, 07:17:18 PM »
What will the smokejacks look like and where will they be placed?
Keep Calm and Get Steamed

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,051
    • View Profile
Re: Engine House - Official Work Thread
« Reply #299 on: September 10, 2022, 03:11:11 PM »
Work is back underway.











United Timber Bridge Workers, Local 1894, Alna, ME