Some photos from yesterday, Saturday, December 4th...
As Fred Morse keeps a 12" x 12" timber elevated with the tractor, Brendan Barry squares an end.

Fred secures a strap to one of the timbers. This timber will be used as a post between bays 2 and 1 in the engine house.

Brendan lifts the timber for its move to the engine house.

Maneuvering the timber around the front of the engine house.

The first post between bays 2 and 1 has been set, as Stewart Rhine watches for the second post to be delivered and set.

Securing the second post.

View showing both posts now in place.
