Author Topic: Engine House - Official Work Thread  (Read 101383 times)

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,069
    • View Profile
Re: Engine House - Official Work Thread
« Reply #150 on: July 14, 2021, 12:26:32 PM »
Stewart got some pictures of us setting the track panels in the roundhouse yesterday.





United Timber Bridge Workers, Local 1894, Alna, ME

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,416
  • Life member. Ack.
    • View Profile
Re: Engine House - Official Work Thread
« Reply #151 on: July 14, 2021, 12:54:45 PM »
What–me worry?

Fred L. Kuhns

  • Museum Member
  • Hostler
  • ***
  • Posts: 222
    • View Profile
Re: Engine House - Official Work Thread
« Reply #152 on: July 14, 2021, 03:27:25 PM »
 Will the run through track have a landscape wall added in the future?   Fred Kuhns

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: Engine House - Official Work Thread
« Reply #153 on: July 14, 2021, 06:17:48 PM »
I remember doing the same work for both the concrete floor in bays 2 & 3 in the shop building, and the extension of the car barn.  It's not as simple as it looks.  Bravo Brendan

Bob

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,642
    • View Profile
Re: Engine House - Official Work Thread
« Reply #154 on: July 17, 2021, 07:46:01 PM »
I gave Brendan a hand for a little bit straightening and leveling the track in stall 3 until Fred pulled me away. I came back and he had finished leveling and was installing the wood for the flangeways.



Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,642
    • View Profile
Re: Engine House - Official Work Thread
« Reply #155 on: July 24, 2021, 05:58:21 PM »
Ready for the concrete contractor to pout the floor



Mike
Doing way too much to list...

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,285
    • View Profile
    • wwfry.org
Re: Engine House - Official Work Thread
« Reply #156 on: August 09, 2021, 09:04:32 AM »
Ed Lecuyer
Moderator, WW&F Forum

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,225
  • Loco for 6
    • View Profile
Re: Engine House - Official Work Thread
« Reply #157 on: August 09, 2021, 10:49:02 AM »
When I first saw the article on my newsfeed, I clicked on it because I thought somebody's house in Wiscasset burned but was getting rebuilt in Alna, which I thought was really curious.  The next thought was maybe a town line change, which I thought unlikely.  I was pleasantly surprised to see we were featured.

Dwight Winkley

  • Museum Member
  • Fireman
  • ****
  • Posts: 373
    • View Profile
Re: Engine House - Official Work Thread
« Reply #158 on: August 09, 2021, 04:02:29 PM »
On the newspaper page about WW&F, on lower right corner is another newspaper ilink. The old Miss Wascasset Diner will be reopening for breakfast and lunch.

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: Engine House - Official Work Thread
« Reply #159 on: August 09, 2021, 06:16:22 PM »
Really excited to see Miss Wiscacasset reopen, no matter the name.  I loved the previous owner family's southern take on the menu (their family was from Mississippi -- grits, chicken fried steak, etc).

We went there often over the last 5-6 years, and really missed it when it closed.  We'll be going back for sure.

Bob

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,353
    • View Profile
Re: Engine House - Official Work Thread
« Reply #160 on: August 10, 2021, 08:07:10 AM »
A nicely written article. Wasn't the water tank a replica of the Head Tide tank?

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,069
    • View Profile
Re: Engine House - Official Work Thread
« Reply #161 on: August 14, 2021, 01:55:39 PM »
The concrete contractors have been back and prepped for the floor. Hopefully we'll have a floor this week sometime.





United Timber Bridge Workers, Local 1894, Alna, ME

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,353
    • View Profile
Re: Engine House - Official Work Thread
« Reply #162 on: August 15, 2021, 09:31:20 AM »
Any idea when they will pour the floor?

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Dwight Winkley

  • Museum Member
  • Fireman
  • ****
  • Posts: 373
    • View Profile
Re: Engine House - Official Work Thread
« Reply #163 on: August 15, 2021, 06:52:34 PM »
Brendan above said some time this week. Cement contractor did not  pour last week because of the high heat wave.
« Last Edit: August 16, 2021, 09:17:39 PM by Dwight Winkley »

Mike Arnold

  • Museum Member
  • Switchman
  • **
  • Posts: 54
    • View Profile
    • Twin Forks NRHS
Re: Engine House - Official Work Thread
« Reply #164 on: August 16, 2021, 10:32:44 PM »
Brendan above said some time this week. Cement contractor did not  pour last week because of the high heat wave.
I remember being docked at Bath at the Maritime Museum and it was 104! Hiding under the gangway for shade. I remember saying this it the hottest I have ever felt. Still nothing here in Florida gets close to that week in Maine. It dropped in temperature the week after but man!
Mike
United States Merchant Marine.
Cadet at NY Maritime College