Author Topic: Engine House - Official Work Thread  (Read 126437 times)

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,109
    • View Profile
Re: Engine House - Official Work Thread
« Reply #165 on: August 20, 2021, 03:57:28 PM »
The pit floor was poured today. Weather depending the rest of the floor will be next Wednesday.











United Timber Bridge Workers, Local 1894, Alna, ME

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,751
    • View Profile
Re: Engine House - Official Work Thread
« Reply #166 on: August 20, 2021, 05:55:51 PM »
Looks Great, but where's the Pit Floor Drain ?  Or is it hidden by the foundation wall.
Moxie Bootlegger

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,485
    • View Profile
    • wwfry.org
Re: Engine House - Official Work Thread
« Reply #167 on: August 20, 2021, 06:25:23 PM »
Yes, the drain is hidden by the wall - it is just outside of the visible floor space in the bottom right of the pit.
Ed Lecuyer
Moderator, WW&F Forum

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 774
    • View Profile
Re: Engine House - Official Work Thread
« Reply #168 on: August 20, 2021, 06:49:34 PM »
Great day today weatherwise; super progress

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,701
    • View Profile
Re: Engine House - Official Work Thread
« Reply #169 on: August 21, 2021, 07:07:36 AM »
In the third photo down, the guy with the red shirt bent forward is the approximate location of the sump hole. There is also a green pipe that comes in through the exterior wall which is just above the pit sump hole.
Mike
Doing way too much to list...

Graham Buxton

  • Museum Member
  • Fireman
  • ****
  • Posts: 471
    • View Profile
Re: Engine House - Official Work Thread
« Reply #170 on: August 21, 2021, 07:20:31 AM »
In this photo that Stewart posted to the NGDF forum the sump is visible:


There is a guy in a red shirt bending over in the left upper corner of the pit, and the black wall of the sump is visible in front of where his feet would be, along with a portion of the green horizontal drain pipe.



Graham

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,380
    • View Profile
Re: Engine House - Official Work Thread
« Reply #171 on: August 21, 2021, 07:21:49 AM »
Glad to see the cement pouring is proceeding.

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,455
  • Life member. Ack.
    • View Profile
Re: Engine House - Official Work Thread
« Reply #172 on: September 05, 2021, 11:16:16 AM »
As noted elsewhere, lumber has arrived to start framing the engine house.  Here James Patten and Brendan Barry are sorting the lumber Saturday morning, September 4th.


The sorted lumber was then stacked by the engine house foundation.  The engine house floor is expected to be poured soon, along with the turntable pivot foundation (form in the right foreground).


I-beams have also arrived, to be cut up and used as vertical supports for the pit track rails.


Bryce Weeks (right) and Dan Malkowski busy cutting the I-beams to length.
« Last Edit: September 05, 2021, 11:18:24 AM by Bill Reidy »
What–me worry?

Graham Buxton

  • Museum Member
  • Fireman
  • ****
  • Posts: 471
    • View Profile
Re: Engine House - Official Work Thread
« Reply #173 on: September 08, 2021, 05:51:42 PM »
The concrete floor has been poured as you can see in this photo Stewart posted to the WW&F Facebook page:


(click image to see larger, and you can click that again to see full-size)


Graham

Kevin Kierstead

  • Museum Member
  • Switchman
  • **
  • Posts: 94
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #174 on: September 08, 2021, 06:43:32 PM »
why is the left side track not centered in it's section of the engine house?
BATLRSBS: Brotherhood of Amalgamated Track Layers, Rail Spikers and Ballast Spreaders; ToM/Trout Brook Chapter

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,847
    • View Profile
Re: Engine House - Official Work Thread
« Reply #175 on: September 08, 2021, 06:45:14 PM »
If you look at the first post, first page in this thread, you’ll see a floor plan which explains the placement of the two outer tracks.

Thanks,
Jason

Kevin Kierstead

  • Museum Member
  • Switchman
  • **
  • Posts: 94
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #176 on: September 08, 2021, 10:20:44 PM »
Ah ha, got it: the track is parallel to the outer wall just like the pit track! thanks, K.
« Last Edit: September 08, 2021, 10:29:11 PM by Kevin Kierstead »
BATLRSBS: Brotherhood of Amalgamated Track Layers, Rail Spikers and Ballast Spreaders; ToM/Trout Brook Chapter

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,109
    • View Profile
Re: Engine House - Official Work Thread
« Reply #177 on: September 09, 2021, 12:17:01 PM »
The roundhouse floor was poured yesterday morning. The concrete crew arrived at 5:30 am and the first mixer arrived at 6am.



























United Timber Bridge Workers, Local 1894, Alna, ME

Dave Crow

  • Museum Member
  • Fireman
  • ****
  • Posts: 395
    • View Profile
Re: Engine House - Official Work Thread
« Reply #178 on: September 09, 2021, 04:06:23 PM »
Looks great!

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,444
  • Life Member
    • View Profile
Re: Engine House - Official Work Thread
« Reply #179 on: September 09, 2021, 05:41:35 PM »
Looks great!
Of course it looks great.  Our chief foreman Fred was clearly on the job to make sure it turned out great.  Thanks Fred!
~ B2 ~ Wascally Wabbit & Gofer ~