As noted elsewhere, lumber has arrived to start framing the engine house. Here James Patten and Brendan Barry are sorting the lumber Saturday morning, September 4th.
The sorted lumber was then stacked by the engine house foundation. The engine house floor is expected to be poured soon, along with the turntable pivot foundation (form in the right foreground).
I-beams have also arrived, to be cut up and used as vertical supports for the pit track rails.
Bryce Weeks (right) and Dan Malkowski busy cutting the I-beams to length.