Anticipated work for Tuesday, Wednesday, 12-13 January, 2021.
* Completed skids and load stationary steam engine.
* Small engine repair.
* Shop work, vacuum brakes, lathe set up prep.
* Locomotive #9 maintenance/repairs (pending).
* Coach #9 (pending)
* Campus clean up, dump run.
* Archives and Gift shop on going.
* Container: move/arrange locomotive parts. (pending)
Rules and Standards for Operations
XX. Safety Rules (Rules 140-152)
148. Walking within Pinch Points
Standing or Walking between moving equipment and
and any fixed object closer than 6 feet from the track
is prohibited.