Anticipated work for Tuesday and Wednesday 1 and 2 December 2020

Tuesday:
*  There is a heavy rain and wind warning for Monday thru Tuesday.
*  Shop work, vacuum brake stand, set up for test on Wednesday.
*  Small engine repair (Brookville-Pending)
*  Electric building (“Start” may have already completed it)
*  Trash run
*  Campus clean up

Wednesday:
*  Full vacuum brake test-in steam with both coaches.
*  Hot drain Locomotive #9 for maintenance (Pending)
*  Breakwater School Charter
*  Small engine repair (pending)
*  Archives and gift shop
*  Recover Tamper from TOM (pending)

Notes:
*  Don’t forget your masks.

*  Rules and Standards for Operations

    Railroad Operation Requirements (Rules 50-56)

      #51  Switch Position  (page 19)
          C.  Yard Switch Position
               Yard switches shall be lined against any track which
               leads to the interior of a building.
         

Joe Fox

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,276
    • View Profile
Re: December 2020 Work Reports
« Reply #1 on: November 30, 2020, 05:35:56 PM »
I like the rule refresher. Many operations do a safety rule of the day by field. For example, transportation, track, mechanical, etc all have different rules, EXCEPT those few that pertain to all said crafts.

Keith Taylor

  • Museum Member
  • Engineer
  • ****
  • Posts: 732
  • Life Member
    • View Profile
Re: December 2020 Work Reports
« Reply #2 on: November 30, 2020, 07:01:43 PM »
I like the rule refresher. Many operations do a safety rule of the day by field. For example, transportation, track, mechanical, etc all have different rules, EXCEPT those few that pertain to all said crafts.
Safety Rule No.1......don’t eat crackers in bed!

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: December 2020 Work Reports
« Reply #3 on: November 30, 2020, 07:04:16 PM »
Totally agree Joe.  This could be a long term part of Jason's campaign for the new rules book.

It's a lot easier to absorb one tip at a time to refresh your memory of the rules.  This one little tip clearly made sense to me as a work report update.

Steve (and others), you might consider doing this regularly to reinforce safety.


James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,222
  • Loco for 6
    • View Profile
Re: December 2020 Work Reports
« Reply #4 on: December 02, 2020, 07:13:35 AM »
Anticipated work for Saturday Dec 5:

* Pavilion - finish the west roofing, start (?) on the end cap boarding.
* Machine shop
* Boxcar 56

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,642
    • View Profile
Re: December 2020 Work Reports
« Reply #5 on: December 02, 2020, 09:21:19 AM »
Pavilion work is weather depending..
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,642
    • View Profile
Re: December 2020 Work Reports
« Reply #6 on: December 03, 2020, 09:21:06 AM »
We are going to do some work on the Pavilion Friday because of the expected weather Saturday.  Any help is welcome.
Mike
Doing way too much to list...

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 430
    • View Profile
Re: December 2020 Work Reports
« Reply #7 on: December 03, 2020, 09:42:06 AM »
Work completed Tuesday and Wednesday 1-2 December 2020

Tuesday:
*  Heavy rains and winds
*  Shop work, vacuum brake prep for Wednesday.
*  Repair work continued on the Brookville

Wednesday:
*  Main line checked for storm damage, 1 large spruce removed.
*  Breakwater School charter completed in the morning.
*  Locomotive #9 Vacuum brake test to include coaches #3 and #8
    conducted all afternoon.
*  Holiday photo’s etc. taken for marketing.
*  Campus clean up, weed whacking
*  Archives work continues.
*  Electric building (“Start” was working inside building).

Keith Taylor

  • Museum Member
  • Engineer
  • ****
  • Posts: 732
  • Life Member
    • View Profile
Re: December 2020 Work Reports
« Reply #8 on: December 03, 2020, 12:20:28 PM »
Work completed Tuesday and Wednesday 1-2 December 2020
Wednesday:


*  Locomotive #9 Vacuum brake test to include coaches #3 and #8
    conducted all afternoon.


Any word of how the brake tests went?

Keith

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,282
    • View Profile
    • wwfry.org
Re: December 2020 Work Reports
« Reply #9 on: December 03, 2020, 12:24:36 PM »
Quote
Any word of how the brake tests went?

Basically no change in their effectiveness from the prior in-train test.
Ed Lecuyer
Moderator, WW&F Forum

Roger Cole

  • Museum Member
  • Hostler
  • ***
  • Posts: 227
    • View Profile
Re: December 2020 Work Reports
« Reply #10 on: December 03, 2020, 01:49:44 PM »
Work completed Tuesday and Wednesday 1-2 December 2020

Tuesday:
*  Heavy rains and winds

Wednesday:
*  Locomotive #9 Vacuum brake test to include coaches #3 and #8
    conducted all afternoon.

Here in Appalachia we had about 10 inches of snow.

Vacuum brakes suck!

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: December 2020 Work Reports
« Reply #11 on: December 03, 2020, 06:43:32 PM »
Hey Steve, where is your weekly rules tip?  Those are valuable.

Ed, you say the vacuum brake test was the same as the first.  You don't say if that's good or bad...

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 430
    • View Profile
Re: December 2020 Work Reports
« Reply #12 on: December 03, 2020, 07:17:27 PM »
Bob, this is a work in progress with hopes to continue each or every other week.

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,282
    • View Profile
    • wwfry.org
Re: December 2020 Work Reports
« Reply #13 on: December 03, 2020, 07:56:50 PM »
OK, here's a rule that bears repeating:

Quote
Three Points of Contact on Moving Equipment
When riding, boarding or dismounting moving equipment, a minimum of three points of contact must be maintained at all times, unless sitting. The three points must be two hands and a foot or two feet and a hand.

Sounds easy, right. Well what happens when you are trying to signal when riding a flatcar full of ballast, for example? Be sure to do whatever it takes to comply with the rule.

Quote
Ed, you say the vacuum brake test was the same as the first.  You don't say if that's good or bad...
Correct. It is not my place to make that judgement.
I will say that further refinements and improvements are planned as the project continues to mature.
Ed Lecuyer
Moderator, WW&F Forum

Graham Buxton

  • Museum Member
  • Fireman
  • ****
  • Posts: 450
    • View Profile
Re: December 2020 Work Reports
« Reply #14 on: December 03, 2020, 09:03:37 PM »
OK, here's a rule that bears repeating:

Quote
Three Points of Contact on Moving Equipment
When riding, boarding or dismounting moving equipment, a minimum of three points of contact must be maintained at all times, unless sitting. The three points must be two hands and a foot or two feet and a hand.

Sounds easy, right. Well what happens when you are trying to signal when riding a flatcar full of ballast, for example? Be sure to do whatever it takes to comply with the rule.

Keep in mind that you asked this question.  :)

Well, when riding a a flatcar full of ballast, the obvious solution is  simply to sit on your butt, then [per the rule you quoted] only that one point of contact [your butt] is required.  So you have  two hands free to signal ...
 ::)

... you did ask ...  ;D