What's the plan for the cable pull box in front of the electrical building? That's where the two Ethernet cables go between our incoming feed and the office. Last I saw it was just a few 2X boards making a box. Ought to be something sturdier than that.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,642
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #91 on: August 14, 2021, 04:29:50 PM »
Josh has purchased the fiberglass boxes and the will be installed Fall Work Weekend, as well as burying the conduit from where we left off near the temporary box to the Enginehouse and Car Barn.
Mike
Doing way too much to list...

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #92 on: August 14, 2021, 06:11:31 PM »
Getting conduit to Engine House and Carbarn will be HUGE!

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,417
  • Life Member
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #93 on: August 14, 2021, 09:41:33 PM »
Getting conduit to Engine House and Carbarn will be HUGE!
  It's just a little digging for Mike or Brendan.  They both just love to tear up the ground...  And they are so good at it!
« Last Edit: August 14, 2021, 10:08:44 PM by Bill Baskerville »
~ B2 ~ Wascally Wabbit & Gofer ~

John McNamara

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,586
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #94 on: August 14, 2021, 09:47:29 PM »
I realize I may be "spilling the beans," but rumor has it that Jason has designed a two-foot gauge TBM (Tunnel Boring Machine).

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,353
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #95 on: August 15, 2021, 09:23:19 AM »
I realize I may be "spilling the beans," but rumor has it that Jason has designed a two-foot gauge TBM (Tunnel Boring Machine).

Does that mean we can go under Route 218, rather than across it? :o

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Graham Buxton

  • Museum Member
  • Fireman
  • ****
  • Posts: 451
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #96 on: August 15, 2021, 10:20:56 AM »
Hopefully Jason's TBM has that all important WPCLI* option included!   ;D

*WaterProof Concrete Liner Installer



Seems like the water table might not be too far down in the vicinity of Route 218.
Graham

Russ Nelson

  • Museum Member
  • Baggageman
  • **
  • Posts: 125
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #97 on: August 26, 2021, 09:28:21 AM »
Josh has purchased the fiberglass boxes and the will be installed Fall Work Weekend,
Fall Work Weekend! Yay!
Quote
as well as burying the conduit from where we left off near the temporary box to the Enginehouse and Car Barn.
Will we be wanting wired network connectivity to the Enginehouse and Car Barn? Ewa and I could run the wires during FWW.

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #98 on: August 26, 2021, 06:55:15 PM »
We're sort of making fun of all this, but my annual contributions will continue to be dedicated to this very serious infrastructure project until 1) the electrical house is fully functional in distributing power to the entire campus, 2) the carbarn has full connectivity and is adequately lighted as a museum and car display space, and 3) the engine house if fully functionally electrically.

I hope others agree with me and will also dedicate funding resources to making this happen.

Bob

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,416
  • Life member. Ack.
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #99 on: June 17, 2023, 09:30:25 PM »
This project has quietly been progressing since the last update in this thread 22 months, occasionally discussed in the monthly work reports.  Here's a photo early this morning (June 17th) of Zack Wyllie, Josh Recave and his dad Gary Recave inside the electric building, showing a small portion of the work done so far.