Author Topic: Electric Building - Official Work Thread  (Read 29660 times)

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,354
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #45 on: November 22, 2020, 07:10:19 PM »
I just noticed the extension cord through the window opening. Is it delivering electricity from the building or to the building? :o

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,070
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #46 on: November 22, 2020, 09:38:01 PM »



United Timber Bridge Workers, Local 1894, Alna, ME

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,285
    • View Profile
    • wwfry.org
Re: Electric Building - Official Work Thread
« Reply #47 on: November 23, 2020, 12:32:12 PM »
[Moderator's Note]
ANOTHER two pages of puns and other nonsense (squirrel-powered generators, really??) have been split off from this topic and placed into the Whimsical Weirdness and Foolery section.

Honestly, I am quite surprised (shocked, even) at how nice the building looks at that location. It really fits into the Sheepscot campus area nicely in style, form, and function. Good job to Brendan, Stewart, Josh, and the rest of the crew!
Ed Lecuyer
Moderator, WW&F Forum

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #48 on: November 23, 2020, 12:47:28 PM »
The size made all the difference. Brendan was able to make it look like a Railroad related structure easily because of that. And the cedar shakes, antique door and window really make the building complete.

This building is over 2 years in the making.. We buried the first pipes in 2018, and dug out to put a load of gravel in shortly after. We wanted it to settle over the winter. Well, it settled over 2 winters..
Mike
Doing way too much to list...

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,416
  • Life member. Ack.
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #49 on: November 23, 2020, 03:51:50 PM »
Honestly, I am quite surprised (shocked, even) at how nice the building looks at that location. It really fits into the Sheepscot campus area nicely in style, form, and function. Good job to Brendan, Stewart, Josh, and the rest of the crew!

I agree.  I was concerned about the building's location and it's potential visual impact around the turntable, though I understood why it had to be sited where it is.  I'm very pleasantly surprised how nice the building looks.  Great job by all involved.
What–me worry?

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #50 on: November 23, 2020, 07:09:42 PM »
OK, now that this handsome building is nearly complete, can we begin to turn our attention to what it's going to take to make it operational?  That will be at least as fascinating as the construction of the building itself.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #51 on: November 24, 2020, 09:53:05 AM »
That is all on our electrician and to be completed under his guidance only.
Mike
Doing way too much to list...

Bob Holmes

  • Museum Member
  • Conductor
  • *****
  • Posts: 758
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #52 on: November 24, 2020, 07:11:51 PM »
But can he explain it to us as he plans and executes?  We will all learn a lot from that.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,643
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #53 on: November 25, 2020, 10:24:55 AM »
This is one wall inside one of our electrical containers. Based on my conversations with Josh, this is about what he will be installing. Each building will have a breaker in this building, and there will also be a Main breaker that kills everything..

Mike
Doing way too much to list...

Graham Buxton

  • Museum Member
  • Fireman
  • ****
  • Posts: 451
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #54 on: November 25, 2020, 12:05:56 PM »
This is one wall inside one of our electrical containers.

I'm guessing that by "our" you are referring to "your" employer - do I have that correct?

Noting the "480 volts" label on one of the breaker boxes, suggests that box is 3 phase.   Is there any plan for 3 phase in the shop facility at Sheepscot?    (Regardless of whether the WW&F would 'like' to use 3-phase for certain equipment, if that capability is not on the power poles on Cross Road, then  3 phase is not likely an affordable option.)
« Last Edit: November 25, 2020, 12:14:19 PM by Graham Buxton »
Graham

John McNamara

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,587
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #55 on: November 25, 2020, 12:11:22 PM »
The presence of a fan or AC in the upper left corner of the photo brings up the question of ventilation. What are the thoughts on this?

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,023
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #56 on: November 25, 2020, 12:45:23 PM »
A phase converter could provide 3 phase to the shop.

Roger Cole

  • Museum Member
  • Hostler
  • ***
  • Posts: 227
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #57 on: November 25, 2020, 02:57:03 PM »
Don't forget warning signs.

Benjamin Richards

  • Museum Member
  • Fireman
  • ****
  • Posts: 362
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #58 on: November 25, 2020, 03:12:26 PM »
CMP has a neat online map (through ARCGIS) that shows the location of their 3-phase circuits.

https://www.arcgis.com/apps/Styler/index.html?appid=efb79ff9e99c448fb6683ad192324375

The nearest 3-phase to the museum is shown as downtown Wiscasset, on Hooper Street, which serves the elementary school. Extending it up to Sheepscot isn't likely to be economically feasible.

Phase converters or VFD's are possible solutions for equipment that warrants it.

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,417
  • Life Member
    • View Profile
Re: Electric Building - Official Work Thread
« Reply #59 on: November 25, 2020, 03:45:29 PM »
Or, there is always the three phase generator that I think is still outside the shop.  At least I think it is a three phase generator.  I know it was used to run some of the equipment that had power requirements that were not available from the commercial lines.
~ B2 ~ Wascally Wabbit & Gofer ~