Work done on Saturday Mar 14:
* Locos: A sizeable crew from MNG was onsite putting 3 and 7 back together after inspections this past week.
* Machine shop: Carlos and Jerry were working on the riveter. Mike's photos show it white, but when I saw it a little after noon it was black.
* Track: Dana showed up to spike the last of the track at the north end, he was joined by Dan, James, and Bryce.
* Pavilion: Mike, Fred, me, and Stewart put up all of the north side and one panel on the south side.
* Gift shop: The floor has been painted (looks sharp) and so Linda needed help moving furniture back to paint the unpainted section.
* Board meeting: went long.