Work done on Saturday Feb 28 29. I left before noon so I'll report what I know:
* Loco 9 and 3 were switched positions in the shop and 9 was rotated. MNG crews showed up to prep their engines for State boiler inspection this coming week.
* Carlos and Jerry were working on the squeeze riveter.
* Dan and Bryce fired up the forge to work on something for the vacuum brakes.
* Linda had me do some inventory recounting upstairs.
I was supposed to help Mike and Fred at the Pavilion but never made it due to multiple distractions.