Price is total package so you have to account for surveying, grading, any cuts and fills, culverts, bridges, grade crossings, signaling, plus any switches, sidings, and yards. They got their 39 km quite cheap.
By contrast an existing line rehab on a US railroad is close to $1.0 Mil / mile.