While visiting the operating tourist EBT, their history involved engineering co-operation with the Pennsylvania RR such that at Mt. Union a crane system was constructed to move standard gauge coal car bodies, unloaded or loaded, but not trucks, up- over and onto EBT 3' gauge trucks. Of course this was approved and blessed by the Pennsy.