December 2017 Work Planning
« on: November 29, 2017, 07:02:24 AM »
Anticipated work for Saturday December 2:

* Mountain ROW storm clean up - several trees came down, eventually they will need to be cleaned up.
* Boxcar 67
* Bridge
* Christmas prep
« Last Edit: December 02, 2017, 05:50:28 PM by James Patten »

Joe Fox

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,262
    • View Profile
Re: December 2017 Anticipated Work
« Reply #1 on: December 01, 2017, 08:00:22 AM »
For Christmas prep, I hope to be down tomorrow to help decorate the station with lights, garlin, etc. There are also two low hanging branches that need to come down, and I hope to address those tomorrow as well.

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,025
    • View Profile
    • wwfry.org
Re: December 2017 Anticipated Work
« Reply #2 on: December 01, 2017, 10:13:32 AM »
I gave Linda a set of fairly old glass Christmas tree ornaments. Reportedly, some belong to my great grandmother (whose husband was the Conductor for the Woodstock RR in Vt.) If not from our target era, they will be close. She was going to set them aside for tree trimming this year.
Ed Lecuyer
Moderator, WW&F Forum

Al Michelis

  • Museum Member
  • Switchman
  • **
  • Posts: 97
    • View Profile
Re: December 2017 Anticipated Work
« Reply #3 on: December 01, 2017, 06:45:08 PM »
I have a few outdoor tree ornaments that I can't use here in Maine. They are plastic but look like big (really big) old fashioned glass ornaments. I will get them out and bring them Tuesday - unless I get ambitious and find them in the morning. I also have a ton of incandescent lights (switching everything to LED). Unfortunately they all need to be gone through to see that they work. If you can use them, I will go through them this week. If would rather, I am willing to purchase LED's and donate them.

I have an idea for simulated candles for a tree, which is what the Victorian era would have used. Can't imagine why whole towns didn't burn down. That won't happen this year.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,092
  • Loco for 6
    • View Profile
Re: December 2017 Anticipated Work
« Reply #4 on: December 01, 2017, 07:10:57 PM »
Our supply of working Christmas lights seems to dwindle every year, because once you put them away they are forgotten until it's time to get them out again, then it's too big of a job to try to track down the workable lights.  A donation of LEDs would be awesome.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,092
  • Loco for 6
    • View Profile
Re: December 2017 Work Planning
« Reply #5 on: December 02, 2017, 05:52:55 PM »
Work done on Saturday Dec 2:

* Bridge: as seen by Brendan's posts, the bridge trusses were stood up and chained down.  Tim the bridge man was working on installing 2 cross braces on the bottom at the end of the day.
* Machine shop: Alan, Steve P and Dan were off in the machine shop doing something, but I didn't see what.
* Archives: Linda was working on Archives, with some assistance by me.

Fred Morse

  • Museum Member
  • Engineer
  • ****
  • Posts: 632
    • View Profile
Re: December 2017 Work Planning
« Reply #6 on: December 04, 2017, 04:13:52 PM »
Worked on second set of cross braces today. Steve Z and Steve from Vermont got about Two Thirds of the shims for the stringers on the East side done today.

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,359
  • Life Member
    • View Profile
Re: December 2017 Work Planning
« Reply #7 on: December 04, 2017, 10:05:46 PM »
Now I know why they chained down the trusses.  The answer is in the Trout Bridge Thread.  They were afraid it would float away and get hit by one of those drones or helicopters.  Hence, they had to chain it down to keep it out of the air traffic.
~ B2 ~ Wascally Wabbit & Gofer ~

Fred Morse

  • Museum Member
  • Engineer
  • ****
  • Posts: 632
    • View Profile
Re: December 2017 Work Planning
« Reply #8 on: December 06, 2017, 06:59:26 AM »
Yesterday the third set of cross braces were finish and more spacers were put on the West side, some of the longitudinal 2 x 4's were applied to both sides.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,092
  • Loco for 6
    • View Profile
Re: December 2017 Work Planning
« Reply #9 on: December 06, 2017, 07:01:29 AM »
Anticipated work Saturday Dec 9:

* Victorian Christmas prep
* Bridge construction
* #10 boiler
* Storm cleanup
* Board meeting 4 PM

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,502
    • View Profile
Re: December 2017 Work Planning
« Reply #10 on: December 06, 2017, 05:27:31 PM »
I would like to tidy up the parking lot, specifically the corner by the stump pile. Bridge timbers will be move so we can straighted up everything else.
Mike
Doing way too much to list...

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,697
    • View Profile
Re: December 2017 Work Planning
« Reply #11 on: December 06, 2017, 07:35:25 PM »
Bridge man will be on site Friday and Saturday. 

Jason

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,092
  • Loco for 6
    • View Profile
Re: December 2017 Work Planning
« Reply #12 on: December 09, 2017, 07:30:23 PM »
Work done on Saturday Dec 9:

* Bridge: the remaining under timbers were installed.
* Clean up: With most of the bridge timbers on or near the bridge, the remaining bridge timbers and pieces were gathered into one spot.  Ties, stubs, and other things were generally consolidated so that the parking lot gets as much parking out of it as we can, and so that we can plow for the 4-6 inches tonight and however much we get Tuesday.
* Machine shop: Alan was in there, I think he was working on a piece for the flanger.
* Board meeting.  Roger should be sending the minutes tonight.

Ira Schreiber

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,070
  • Life Member
    • View Profile
Re: December 2017 Work Planning
« Reply #13 on: December 09, 2017, 07:32:34 PM »
No minutes posted since AUGUST. >:(

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,502
    • View Profile
Re: December 2017 Work Planning
« Reply #14 on: December 09, 2017, 09:41:31 PM »
Some more prep work for permits was done this morning before the snow at the bridge site, and along the ROW north of there.

Also, several trees along the grade from End of track North were marked for cutting. A couple days this winter should take care of most of it.
Mike
Doing way too much to list...