Work done on Saturday Dec 9:
* Bridge: the remaining under timbers were installed.
* Clean up: With most of the bridge timbers on or near the bridge, the remaining bridge timbers and pieces were gathered into one spot. Ties, stubs, and other things were generally consolidated so that the parking lot gets as much parking out of it as we can, and so that we can plow for the 4-6 inches tonight and however much we get Tuesday.
* Machine shop: Alan was in there, I think he was working on a piece for the flanger.
* Board meeting. Roger should be sending the minutes tonight.