Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
News:
Current News
Home
Help
Search
Login
Register
W.W.&F. Discussion Forum
»
WW&F Railway Museum Discussion
»
Work and Events
»
Coach 9 - Official Work Thread
« previous
next »
Print
Pages:
1
...
18
19
[
20
]
21
22
...
39
Go Down
Author
Topic: Coach 9 - Official Work Thread (Read 224702 times)
Ted Miles
Museum Member
Fireman
Posts: 362
Re: Coach 9 - Official Work Thread
«
Reply #285 on:
January 08, 2021, 03:51:55 PM »
Folks,
The top of the car looks to be close to the ceiling of the shop in the pictures. Will the car have to be moved outdoors to get the roof installed? And what size will the new wheels be?
Ted Miles, WW&F Life Member
Logged
Mike Fox
Museum Member
Empire Builder
Posts: 5,771
Re: Coach 9 - Official Work Thread
«
Reply #286 on:
January 09, 2021, 08:45:51 PM »
Hi Ted.
The car will fit. It is sitting slightly higher on the blocks than it will on the trucks.
Logged
Mike
Doing way too much to list...
Mike Fox
Museum Member
Empire Builder
Posts: 5,771
Re: Coach 9 - Official Work Thread
«
Reply #287 on:
January 14, 2021, 07:34:57 PM »
Looking to see what I could find to take a photo of on coach 9, and found these corners. Note the block plane. I think these are all done by hand.
Logged
Mike
Doing way too much to list...
Stephen Hussar
Museum Member
Conductor
Posts: 913
Life Member
Re: Coach 9 - Official Work Thread
«
Reply #288 on:
January 15, 2021, 05:45:11 PM »
What else is there to say, but wow! Thanks Mike and Brendan for taking and posting these great pictures!
«
Last Edit: January 15, 2021, 05:46:45 PM by Stephen Hussar
»
Logged
Bob Holmes
Museum Member
Conductor
Posts: 784
Re: Coach 9 - Official Work Thread
«
Reply #289 on:
January 15, 2021, 07:04:31 PM »
Maybe a post from Eric about how they actually did these to such perfection??
Logged
Harold Downey
Museum Member
Brakeman
Posts: 167
Re: Coach 9 - Official Work Thread
«
Reply #290 on:
January 15, 2021, 07:30:03 PM »
They did a 45 deg cut, then two passes at 22.5 degrees on the table saw. Followed up with jack plane to bring down the peaks. Finally, sanding with a form at the correct radius.
ETA: That clear douglas fir makes some real pretty corner posts.
«
Last Edit: January 15, 2021, 07:31:49 PM by Harold Downey
»
Logged
Graham Buxton
Museum Member
Fireman
Posts: 477
Re: Coach 9 - Official Work Thread
«
Reply #291 on:
January 15, 2021, 08:28:56 PM »
I'll admit that I wondered if a "jack plane" was some kind of specialized plane for rounding corners.
But no, a
jack plane
is just an ordinary flat bladed plane.
So, between the jack plane and the curved sanding block, a lot of plain ordinary hard 'hand work' to get the right curved profile.
Nice job!!
Logged
Graham
Mike Fox
Museum Member
Empire Builder
Posts: 5,771
Re: Coach 9 - Official Work Thread
«
Reply #292 on:
January 16, 2021, 06:19:52 PM »
Here is the answer to the question how the shape was achieved. The block on the top is a sanding block.
And here is a before planing piece.
Logged
Mike
Doing way too much to list...
Bob Holmes
Museum Member
Conductor
Posts: 784
Re: Coach 9 - Official Work Thread
«
Reply #293 on:
January 16, 2021, 07:59:44 PM »
Mike, you are always so helpful at revealing WW&F mysteries...
Thanks.
pg
Logged
James Patten
Administrator
Superintendent
Posts: 4,367
Loco for 6
Re: Coach 9 - Official Work Thread
«
Reply #294 on:
January 16, 2021, 09:17:11 PM »
There was a question as to whether the car would fit inside Bay 4 for work once it got on its wheels. Zack did some careful measuring and he thought that it would - but without the smoke jack.
Logged
Mike Fox
Museum Member
Empire Builder
Posts: 5,771
Re: Coach 9 - Official Work Thread
«
Reply #295 on:
January 21, 2021, 05:53:11 PM »
Test fit of the quarter round door trim..
Logged
Mike
Doing way too much to list...
Jeff Schumaker
Museum Member
Inspector
Posts: 1,398
Re: Coach 9 - Official Work Thread
«
Reply #296 on:
January 22, 2021, 09:51:48 AM »
Looks like they fit pretty well. Thanks for the continued photo update.
Jeff S.
Logged
Hey Rocky, watch me pull a moose trout out of my hat.
Mike Fox
Museum Member
Empire Builder
Posts: 5,771
Re: Coach 9 - Official Work Thread
«
Reply #297 on:
January 29, 2021, 07:10:59 PM »
Headache boards being fitted..
Logged
Mike
Doing way too much to list...
Mike Fox
Museum Member
Empire Builder
Posts: 5,771
Re: Coach 9 - Official Work Thread
«
Reply #298 on:
February 05, 2021, 07:58:34 PM »
End framework and pieces . top photo is one end glued and drying
Logged
Mike
Doing way too much to list...
Ted Miles
Museum Member
Fireman
Posts: 362
Re: Coach 9 - Official Work Thread
«
Reply #299 on:
February 14, 2021, 03:59:06 PM »
While all this great wood work is going on; is anything happening about trucks for the car? I guess patterns for Jackson & Sharp trucks will be needed. And then there is the matter of new wheels.
Ted Miles, WW&F Member
Logged
Print
Pages:
1
...
18
19
[
20
]
21
22
...
39
Go Up
« previous
next »
W.W.&F. Discussion Forum
»
WW&F Railway Museum Discussion
»
Work and Events
»
Coach 9 - Official Work Thread