Work done on Saturday April 1:
Unfortunately a very localized storm super cell dropped five feet of snow in the area around (not in) the Midcoast of Maine, so only Fred, Zack, Steve Z, myself, and the Rhines made it in, so volunteers were limited today. It was like a snow donut.
* Container shelving: we doubled the number of shelves in the container.
* Boxcar 67: Zack finished the last belt rail, and started working on the tension rods on the side. Fred and I brought over the remaining siding that was stored in 309. Next week Steve Z will be running the siding boards through a router to put a groove in the side to match the old siding.
Fred tried to show off the triple bladed chain saw but it got stuck in a stump.