52
Mike
Doing way too much to list...

Charlie Lacasse

  • Museum Member
  • Gandy Dancer
  • *
  • Posts: 13
    • View Profile
Re: December 2016 Work Planning
« Reply #46 on: December 14, 2016, 03:07:49 AM »
I'm planning on being there for victorian christmas to help out. I've been waiting to see if I was going to have to work or not. I'm not crew certified but I'm sure I can help out in some way.

see ya there,
Charlie

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,381
  • Loco for 6
    • View Profile
Re: December 2016 Work Planning
« Reply #47 on: December 14, 2016, 07:04:38 AM »
Anticipated work for Saturday December 17: Victorian Christmas

I think our most pressing need is crowd control: for platforms at Sheepscot and the one platform at Alna Center; for parking (typically we end up with folks way out on Rt 218); for guidance, etc.  Tickets will be distributed from the Preble's flag stop building, which currently is located at the Southwest corner of the shop building.

The day is supposed to start very cold (getting warmer during the day), and the forecast has snow coming during the day.  So while we're expecting another record crowd, we may not get it.

Greg Klein

  • Museum Member
  • Switchman
  • **
  • Posts: 87
    • View Profile
Re: December 2016 Work Planning
« Reply #48 on: December 14, 2016, 12:54:59 PM »
I'll be there!  Also will try to make it on Friday.  This will be a cold weekend.  Windchill is supposed to be very bad.

Charlie Lacasse

  • Museum Member
  • Gandy Dancer
  • *
  • Posts: 13
    • View Profile
Re: December 2016 Work Planning
« Reply #49 on: December 14, 2016, 02:06:57 PM »
Hey Steve,
I accept your offer and I look forward to working with bob heating up the water. I am ready and willing.


See you there,
Charlie

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,873
    • View Profile
Re: December 2016 Work Planning
« Reply #50 on: December 15, 2016, 02:43:40 PM »
Operating Plan change:

Due to the weather forecast for Saturday, which we suspect will cause both a smaller public showing and fewer volunteers, we have changed our operating plan to a single train operation.  

If you have a long distance to travel to help us- please be careful.  If you can't make it due to the weather- do not worry- we won't hold it against you and will still put you to work the next time you come!

If you decide not to come, please let us know.  We still have a basic crew need across the board (crowd control, parking, train crew, refreshments, etc), so we'd like to plan according to who we expect, if possible.

Thanks,
Jason
« Last Edit: December 15, 2016, 02:46:22 PM by Jason M Lamontagne »

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,785
    • View Profile
Re: December 2016 Work Planning
« Reply #51 on: December 15, 2016, 03:38:47 PM »
I think we should still plan on a 2 train operation, just in case. At least be ready with the second train on standby
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,381
  • Loco for 6
    • View Profile
Re: December 2016 Work Planning
« Reply #52 on: December 17, 2016, 05:44:54 PM »
Work done on Saturday December 17:

* Victorian Christmas.  It started snowing before 7, and was starting to come to an end around 4.  We got 4 or 5 inches.  It was also somewhat cold, temp was 6 this morning and is might have got up to early 20s.  All this to say we broke no records today.  We may have gotten 500.  We had no trouble fitting people on the trains.  Just one train set.  We turned #52 on the table so the plow pointed south, and 52 pulled the train south while 9 pulled it north.
* Boxcar 67: After Zack got wet getting the water tank filled he decided to stay at Sheepscot, so he finished flooring the boxcar.

Ira Schreiber

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,070
  • Life Member
    • View Profile
Re: December 2016 Work Planning
« Reply #53 on: December 17, 2016, 07:58:34 PM »
8"-10" of fresh snow here and -15* with wind chill -30*
Brrrrrr.........
Aurora, CO
« Last Edit: December 18, 2016, 12:15:08 AM by Ira Schreiber »

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,785
    • View Profile
Re: December 2016 Work Planning
« Reply #54 on: December 17, 2016, 08:56:16 PM »
First train of the day..a little different photo than I shared on facebook.

Mike
Doing way too much to list...

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,482
  • Life member. Ack.
    • View Profile
Re: December 2016 Work Planning
« Reply #55 on: December 17, 2016, 09:33:07 PM »
When I stopped by the museum a little after 7 last night it was -9*F and in Head Tide, -10*F.

Yes -- Brrrr!
We want...A SHRUBBERY!  One that looks nice, and not too expensive.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,785
    • View Profile
Re: December 2016 Work Planning
« Reply #56 on: December 17, 2016, 09:47:45 PM »
A shaky video of the last train of the day.

https://youtu.be/bfKKuvqqixc
Mike
Doing way too much to list...

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,032
    • View Profile
Re: December 2016 Work Planning
« Reply #57 on: December 18, 2016, 07:00:43 AM »
Nice video Mike, instead of fade to black it's fade to steam.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,785
    • View Profile
Re: December 2016 Work Planning
« Reply #58 on: December 18, 2016, 07:23:44 AM »
Mike
Doing way too much to list...

Philip Marshall

  • Museum Member
  • Engineer
  • ****
  • Posts: 697
    • View Profile
Re: December 2016 Work Planning
« Reply #59 on: December 18, 2016, 12:24:40 PM »
Hansel has a nice video up on Youtube already:

https://www.youtube.com/watch?v=VmSnGHUqvZM