Locomotive No. 3

1 - Baldwin catalog, in November 1920.

2 - US Barcelos, SJ da Barra, Brazil in 1974.

3 - In the plant in 1974.

4 - In 1984, on the farm, Rio de Janeiro.

5 - Reform of the boiler.

6 - Exchange internal walls of the furnace.

7 - Inspection of the abutments.

8 - Recovery of the bearings in the bearing housings.

9 - New ashtray.

10 - day tour; the background, the locomotive 148.

11 - After the reform, with new coating boiler.

12 - Another aspect of the machine.

13 - Tour Day.

14 - Maneuvering.

15 - Eye Machinist in lubricator.

16 - Visual of the stoker position.

17 - Small platform along the EF

18 - enthusiasts visit our workshops.

19 - Locomotive 3 with clean-rail old.

20 - With clean-rail again, next to the water tank.

21 - A view from the farm.