Author Topic: March 31, 2007 report  (Read 1975 times)

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 3,591
    • View Profile
    • wwfry.org
March 31, 2007 report
« on: December 13, 2008, 06:27:19 PM »
MODERATORS NOTE:
March 31, 2007 report has been converted from the pre-July 2008 WW&F Discussion Forum.
Some formatting may have been removed or modified from the original postings that appear quoted in this topic.
Information contained within this post may be superseded by more recent postings and conversations.

Joe Fox wrote:
Quote
Today many things were accomplished. Dana showed up, and some much needed track work and prep was done. Such as tie replacements, and checking the tampers to make sure they work properly. The fire car, and indian tanks were also tested and they work good. The yard was cleaned up, such as a lot of unwanted wood, scrap metal, and various other things. #9's frame was worked on, and so wasn't Coach 3's brakes. A woods cutting crew did some cutting today at the North end. Talk to you guys later.
_________________
“We are extremely proud of our collection of historical railroad equipment, which is the largest of any U. S. railroad, especially our steam locomotives.”
-Steve Lee-

Joe
Ed Lecuyer
Moderator, WW&F Forum