Rick, no, my work and home schedule has limited my machine shop time over the winter and this spring. Each machining step for the points is taking longer than I expected, so I won't have them ready until later in the summer. I'd also like to make sure the other material needed for the switches, such as slide plates, connecting bars, attachments to the points themselves, etc. are complete and ready to go as well.
I'm sorry for the delay in having the points ready. If the new mill is installed in the shop before SWW, maybe I can work on machining the sixth point; I had enough 33# rail in Baltimore to bend 3 left-side and 2 right-side points.
Dave Crow