Author Topic: Trout Brook Bridge - Official Work Thread  (Read 333294 times)

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,471
  • Life member. Ack.
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #480 on: August 08, 2018, 06:50:28 PM »
Wow!
What–me worry?

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,446
  • Life Member
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #481 on: August 08, 2018, 07:16:00 PM »
BTW, there was another Marty Moose Trout sighting today. With all this hot weather Marty is eagerly awaiting the shade of our new bridge.
~ B2 ~ Wascally Wabbit & Gofer ~

ALAIN DELASSUS

  • Museum Member
  • Engineer
  • ****
  • Posts: 728
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #482 on: August 09, 2018, 01:43:10 AM »
Hi ! Things are coming along fast from now on . Just can't wait for next pics!

Al Michelis

  • Museum Member
  • Switchman
  • **
  • Posts: 97
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #483 on: August 09, 2018, 07:34:24 AM »
Poor Marty - things will be a little rough for him for a few days.

Impressive photos.

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,392
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #484 on: August 09, 2018, 08:33:38 AM »
Hopefully, Marty will stay out of the way.

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,342
  • Loco for 6
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #485 on: August 09, 2018, 08:57:53 AM »
Actually if everything goes to plan the only thing Marty experiences is additional shade.  I don't think we're supposed to be in the stream at all.

Al Michelis

  • Museum Member
  • Switchman
  • **
  • Posts: 97
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #486 on: August 09, 2018, 09:57:30 AM »
I think pounding on those poles might rock his world a bit.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,736
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #487 on: August 09, 2018, 10:18:15 AM »
No in stream work. Nothing is allowed in the stream per our permits. We have to stay above the normal high water mark, which has been accomplished so far.
Mike
Doing way too much to list...

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,544
    • View Profile
    • wwfry.org
Re: Trout Brook Bridge - Official Work Thread
« Reply #488 on: August 09, 2018, 10:56:03 AM »
If the bridge goes in and Marty does not move from his/her spot, we have materially accomplished the whole goal of the permitting and design process - to erect the bridge in an environmentally-sensitive area without disturbing the natural habitat.

There is also a frog that likes to hang out in the area right in the centerline in the steam bed. We've called him "Datum Frog." I think he will appreciate the shade of the new bridge too.
Ed Lecuyer
Moderator, WW&F Forum

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,446
  • Life Member
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #489 on: August 09, 2018, 05:29:21 PM »
The first pile when in today.  Finished by 4 PM.  Marty and datum Frog were both seen at the end of the day relaxing downstream.  The good news is no one fell in the creek while rock hopping across.   Getting around will be much easier once the bridge is finished.
~ B2 ~ Wascally Wabbit & Gofer ~

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,736
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #490 on: August 09, 2018, 06:06:54 PM »
One less Pile on the pile...

Mike
Doing way too much to list...

Mike the Choochoo Nix

  • Museum Member
  • Fireman
  • ****
  • Posts: 303
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #491 on: August 09, 2018, 08:41:10 PM »
what's the total number of piles to be driven?
Mike Nix

Dwight Winkley

  • Museum Member
  • Fireman
  • ****
  • Posts: 373
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #492 on: August 09, 2018, 09:27:01 PM »
The first pile was placed for the south side of the brook. Crane is on north side.

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,471
  • Life member. Ack.
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #493 on: August 09, 2018, 09:35:22 PM »
Here's Dave's photo of the pile driving today, as posted in the August 2018 Work Reports thread:

What–me worry?

Steve Smith

  • Museum Member
  • Engineer
  • ****
  • Posts: 649
  • Life Member
    • View Profile
Re: Trout Brook Bridge - Official Work Thread
« Reply #494 on: August 09, 2018, 09:48:26 PM »
Did it make a satisfying phft DONK phft DONK phft DONK sound like pile drivers I've watched and heard in action?