We also want to minimize site work, so as to minimize potential environmental disturbance, and the time taken on site. On site work must occur in the same work window that Mike was restricted to this summer; that work window must also include site prep, pile driving, abutment finishing, and final bridge setting. Having the bridge arrive in one piece and set within a couple of days saves boatloads of time.