Day 3.5, Monday -
Some Spring Work Weekend projects continued today with 7 members busy.
* #9 - Work continued on testing the fit and travel of the side rods. Leon worked on the boiler jacket bands. Brendan worked on the tank.
*Restrooms - Zack worked on the stalls and fixtures.
*Sheepscot Station - Touch up painting was done to the track side and south end. The SHEEPSCOT sign was put back up. The interior was cleaned and some touch up was done on the upper inside color.
*Grounds - Brendan built a new bridge over the ditch between the house and shop. We don't have to worry about breaking through the rotten plywood anymore, thanks Brendan!