Dave and Wayne did a fabulous job on them.
Remaining work:
1. The switch points need several holes drilled each, and machined corners eased.
2. We need slide plate material cut to length, hole punched and welded.
3. We need to set final switch timbers.
4. Bend stock rails (already in position) and install points, heel blocks.
5. Make up throw bars.
6. Instal stand, throw bars, adjust.
Still an effort, by worthwhile of course. But it won't be done next week
Jason