As Stewart said in the work thread, the two cables were installed today. I removed every pulley, cleaning the old grease off of them. I also forced new grease through the pins that run through the pulleys. Then I began the reassembly.
After all together, I greased the pulleys again. Also touched up the paint and added some red to the end of the boom. The paint will be dry tomorrow and I can move Ichabod outside.
Next will be figuring the mounts for the counterweight, and making the locks I designed for the railclamps.
I'll snap a couple of shots Saturday in the sun.