2008 - rear frame riveting
2011 - rear frame joined to frame casting. The smokebox was drilled for riveting to the boiler at SWW and the actual riveting to the boiler was Fathers Day weekend 2011. Uniting front and rear frame via new casting.
2012 - work on locating the hand brake staff and handbrake rod and chain in relation to the rear frame, bracing of rear frame, grate shaker linkage begun.
2013 - reuniting the frame with the boiler; tender truck brake work and new swing hanger links made to level the rear frame.
Dave Crow