I'd like to develop two lists related to the No 9 restoration for eventual inclusion in the newsletter, as a matter of providing a record to the membership. I'm inviting the readers here to help flush out those lists. The first is a general list of major restoration activities arranged by year. A first cut is below. The second will be a component by component accounting of the finished, restored machine. I hope to generate a first cut of that, from which we can work, this or next week.
Here's the first cut of the annual list. I may be in error in some areas- feel free to point them out. Also, more detail here would be great. I thought this might be a fin community activity for those who've been paying close attention.
Thanks!
Jason
No 9 restoration by year
2006: document and disassemble
2007: rear frame prep, old forward frame assessment and repair
2008: old frame work, new rear frame
2009: casting. Receive new boiler.
2010: new smokebox. domes and casings on boiler. forward frame manufacture
2011: frame and boiler assembly
2012: tramming
2013: crank pin machine
2014: steam plumbing, deck, rear truck, rear brakes, grate motion
2015: drive gear and final valve work, jacket, cab, tank, front end