Thank you to everyone who worked on the track during the Spring Work Weekend. We put down nearly 300 feet of new siding complete with gravel and stone. The switch crew got the turnout operable and in service (after quite a wrestling match with a rusted switchstand), and the switch at AC was repaired. The siding was quite an accomplishment considering that I was sweating it trying to get the 50 lb rail drilled and cropped so as not to hold up track laying. It was a fun weekend and everyone worked hard and the results speak for themselves. Thank you! No group I have ever worked with was or is better than the WW&F volunteers. You even put up with my bad puns and attempts at jokes...