Author Topic: Track Work at MNG  (Read 4828 times)

Vincent "Lightning" LeRow

  • Museum Member
  • Hostler
  • ***
  • Posts: 219
    • View Profile
Track Work at MNG
« on: June 07, 2010, 12:17:25 PM »
Hi everyone,

I thought I would post this here in case anyone is interested.  There is going to be a track work day on Sunday the 13th, starting between 8:30 and 9:00.  Work includes tie replacement, leveling and tamping, and bolt tightening.

Bringing a lunch is suggested, but there are sandwich and sub shops nearby.
A spike saved is a spike earned.