« Reply #150 on: September 16, 2017, 03:58:11 PM »
What difference a week makes!  That floor looks terrific.

We are very fortunate to have several volunteers as dedicated as Fred. Without them, progress would be much slower.

Every visit I'm always amazed by what has gotten done since my last visit.  I wish I was half as productive as Fred and others.
What–me worry?

Stewart "Start" Rhine

  • Museum Member
  • Trainmaster
  • *******
  • Posts: 2,997
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #151 on: September 16, 2017, 04:36:27 PM »
Today:

* Zack re-installed the work bench (and vice) along the wall under the stairs. And built a shelf over it for the long wood bits.

* The bottom steps were rebuilt to fit the new floor.

* More things were removed from the old east wall and the south end of bay 3 was cleaned up a bit.

A number of visitors walked through the shop, admiring the new floor.  One even noted that we could have a barn dance with all the room.

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #152 on: September 16, 2017, 04:38:35 PM »
Am amazed how much wider, and lighter, the middle bay area looks now, including the bay 1 pass-throughs; floor also looks smoooooother than before.
You guys should get what the Navy awards for outstanding performance, a big Excellence "E" as painted on a deserving ship.

So how big a band is booked in for the Fall Work Week/Shop Building Spruce-up/Washouts Fillup Barn Dance Cotillion?  Start's right...that new floor is just itching for a dance mob!  ;D
Too bad Guy Lombardo passed. 
« Last Edit: September 16, 2017, 04:51:11 PM by Paul Uhland »
Paul Uhland

Alex Harvilchuck

  • Museum Member
  • Hostler
  • ***
  • Posts: 220
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #153 on: September 16, 2017, 05:15:15 PM »
Why not run a 2 (or 3) track box rail along the entire length of the wall between bay 2/3 and bay 1 (at least up to the stairs). Pick it up at your local Lowes, Home Depot or Tractor Supply - it is a regularly stocked item.

You could then put sliding doors on the track as movable partitions so you will be able to close the cutouts . This will support Mike's request to be able to isolate Bay 1 so it can be heated- move the doors and Bay 1 can be isolated with the movable partitions.

I do all of this in my cabinetry shop so I can segment off what I want to heat.
« Last Edit: September 16, 2017, 05:19:27 PM by Alex Harvilchuck »

Ira Schreiber

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,070
  • Life Member
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #154 on: September 16, 2017, 05:51:22 PM »
I know every volunteer counts but Fred is the Poster Child.
Thanks to one and all.
Ira

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,661
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #155 on: September 17, 2017, 09:08:04 AM »
Has anyone given any thought to Epoxy floor paint for the new section?  It makes it so much easier to clean up (especially oil and grease), and with an off-white, grey, or tan color will actually help with the interior lighting and brighten the bay up. 
Moxie Bootlegger

Dwight Winkley

  • Museum Member
  • Fireman
  • ****
  • Posts: 373
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #156 on: September 17, 2017, 09:55:43 AM »
John. New floor already had two coats. See photo's above. Fred is standing on the coated concrete.

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,661
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #157 on: September 17, 2017, 10:25:32 AM »
My understanding is that the two coats is concrete sealer.  That is way different than an industrial epoxy floor paint.  Please correct me if I'm wrong..........
Moxie Bootlegger

Dwight Winkley

  • Museum Member
  • Fireman
  • ****
  • Posts: 373
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #158 on: September 17, 2017, 03:21:13 PM »
sealer

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #159 on: September 17, 2017, 05:19:36 PM »
Yes, expensive epoxy floor paint would be a further improvement, but the multi-coats of sealer would have to be completely acid?removed after the concrete cures, with yet another  delay in area use.  :P
Think it best to use and enjoy the nice, new deck, maybe wipe thy feet and minimize  splats, smears and spills.  ;)

Bet the next project will be a concrete floor in bay 1. 

Heating...what's the latest?
« Last Edit: September 17, 2017, 07:20:24 PM by Paul Uhland »
Paul Uhland

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,661
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #160 on: September 17, 2017, 05:26:12 PM »
I would suggest a couple of free-standing coal stoves with gravity feeds.  Relatively cheap, easy to maintain, and if you want to get fancy there are those that have blower options (1000-2000) cfm for larger spaces.  Can be found online or a decent selection can be bought through tractor supply (TSC).  They have good stuff and are easy to deal with.  I use them all the time.
Moxie Bootlegger

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,564
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #161 on: September 18, 2017, 06:55:50 AM »
No heat planned. We have some portable patio heaters that work great for taking the chill off
Mike
Doing way too much to list...

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,054
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #162 on: October 09, 2017, 05:36:43 PM »
B&SR 67 was the first car back in the shop after the tracks were reconnected this weekend.



United Timber Bridge Workers, Local 1894, Alna, ME

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #163 on: October 09, 2017, 10:56:15 PM »
A perfect picture.
Paul Uhland

Robert Hale

  • Hostler
  • ***
  • Posts: 212
    • View Profile
Re: Shop Building & Machinery Improvements - Official Work Thread
« Reply #164 on: October 10, 2017, 08:10:38 AM »
What happens to the first person that gets the floor greasy or spills oil on it? Smokebox clean-out duty for a week?  :o