Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - Fred L. Kuhns

Pages: [1] 2 3 ... 15
1
 Brendan, thanks for the photos of the pile driver at work on the new passenger platform, interesting to know the process of installing the pile.

2
Work and Events / Re: Coach 9 - Official Work Thread
« on: July 25, 2022, 02:06:21 PM »
 The museum could possibly go online, look for curved plywood manufactures located in United States.

3
Work and Events / Re: Engine House - Official Work Thread
« on: July 04, 2022, 01:53:42 PM »
 I wonder if Brendon ran the boards through the planner S/1 or S/2 ? Really only necessary to make one pass to make all board the same thickness.

4
Work and Events / Re: Engine House - Official Work Thread
« on: October 27, 2021, 12:06:51 AM »
  Brendan,  The pictures show great progress in framing the building. Looking at the large support post the crane has been a great help. Wonder if any angle bracing will be added to the walls after the sheeting is complete?  Thanks for your leadership on the Engine House looking great.    Fred Kuhns










5
Work and Events / Re: Engine House - Official Work Thread
« on: July 14, 2021, 03:27:25 PM »
 Will the run through track have a landscape wall added in the future?   Fred Kuhns

6
  Mike,  Is there a plan to compact the new floor material in the pavilion, or is that necessary ?  Your leadership is greatly appreciated on the following project , which took several years to complete to its present stage.      Fred L. Kuhns                                                                                                                                                                                             

7
Volunteers / Re: January 2021 Work Reports
« on: January 06, 2021, 10:18:52 PM »
 Mike,  Was the Muffler the original or perhaps the second or third. I hear that Fred was really happy to have the truck running again. Now it will not to loud.  Fred L. Kuhns

8
Work and Events / Re: Box Car 67 - Official Work Thread
« on: January 05, 2021, 08:28:10 PM »
  Mike,  The picture of the stationary steam engine also shows off the new roof on boxcar 67.  Thanks Fred L. Kuhns

9
Work and Events / Re: Box Car 67 - Official Work Thread
« on: January 04, 2021, 03:00:06 PM »
 In the last several weeks there was news of the metal roofing being finished and the car return to storage. What is the time frame to complete the brakes and safety chains?       Thanks Fred L. Kuhns

10
Work and Events / Re: Box Car 67 - Official Work Thread
« on: November 24, 2020, 07:59:42 PM »
 It is good news that the metal roof will finally be installed. With the roof on, the brakes can be added along with brake staff, roof walk, and safety chains. The finishing touches sometimes take longer than one would hope.  Hats off to the BOD for seeing the project to completion.   Thanks Fred Kuhns

11
Work and Events / Re: Car Barn Extension - Official Work Thread
« on: July 16, 2020, 04:29:45 PM »
 Brendan,  A little or a year ago the Car Barn Extension construction was began.  The reporting of the progress was greatly appreciated. It now appears you and your crew are ready to began working on finishing the interior, looking forward to the next stage of progress reports.  The pictures of the progress, on all locations of your website , provided added clarity to your written reports.   Thanks,  Fred L. Kuhns

12
Volunteers / Re: June 2018 Work Planning
« on: June 03, 2018, 11:46:39 AM »
Mike, could you provide information on the section house?

13
Museum Discussion / Re: Finding the WW&F on Facebook
« on: November 18, 2017, 06:29:02 PM »
 The work over the last several weeks on the bridge, rock on the woods track, repair to the tool shed and general clean up form the big wind storm. Plus planning for the Christmas trains gives each member of our great museum a great appreciation of all the work done by our local volunteers. Love the new roof on the tool shed. 

14
Work and Events / Re: Mountain Extension - Official Work Thread
« on: October 29, 2017, 04:30:33 PM »
 Mike,  In the times pasted, the timber clearing crews worked in the winter months to clear right of way or other necessary fields for the museum.  Is it possible to still do such while working under permits?

15
  Joe Fox, has a good idea in adding railings on the back side and along the sides of the ramp to the ground.  Could use some of the wooden guards post before they are cut into ties as post.

Pages: [1] 2 3 ... 15