Work is continuing on the J&LNG on three fronts. First is extension of the mainline to the north property line. We have another 100 feet to go to get to the end of what we can build, and in there will be a turnout leading to a future engine servicing area.
Second is the ongoing restoration of the J&L 58. Work on the 58 will be a bit more pleasant over the winter now that the west enginehouse doors have been installed and window panes installed. Just a little more trim work to do and the enginehouse will be complete.
Third is the rebuild of our 5 ton Brookville, J&LNG 64. I am just about ready to put the regauged wheelsets under the frame, then we start remounting all of the drive components. The original flathead Ford V8 and manual transmission was trashed and is being replaced with a 302 and C6 automatic transmission. It will take a bit of shoehorning to get everything to fit, but ought to be an improvement over the old drive.
We plan to begin limited train operations in May, being open and running on Sundays from Memorial Day to Labor Day. Initially the Brookville will be our motive power until 58 is completed and operating.
Merry Christmas from your friends the Ohio two footers!