Wiscasset Motor Lodge opens May 27th. There website says you can book now.

17
You need a 50HP 3 phase converter from American Rotary in Monrovia, CA. I would get a bigger converter so you can run more than one 3 phase machines at the same time. till later, dwight

18
Work and Events / Re: Steam and Saws 2021
« on: January 02, 2021, 10:09:56 PM »
Fred & his Friday crew. The site sure is improved with all the surplus lumber and blocking removed.    Good job by todays brush crew.

Were you able to start a fire in Last Years brush pile. Or did you have to restack it?

19
Work and Events / Re: Wilmar (the) Tamper - Official Work Thread
« on: December 31, 2020, 09:04:26 PM »
It was never in a container. It was shipped on a flat rack. Only had a tarp to keep weather away.

Tamper will be unloaded next week See Wayne's report above.

I heard tamper will be placed on a open trailer for it's highway trip north

20
Joseph. Only the Gables will be sheathed, to 4 inches below the end framework. From roofline to the ground will be open on the ends of the pavilion.

21
Volunteers / Re: November 2020 Work Reports
« on: November 29, 2020, 11:02:38 AM »
Joshua, If you had large stones in the ballast this means the front end operator dug to deep in the ballast pile and scooped the large stones from the gravel under the ballast pile.

22
Work and Events / Re: B&SR Box Car 56 - Official Work Thread
« on: November 13, 2020, 09:32:09 AM »
Ted, All the photo's but the first one, show box car 56 on trucks being moved into the shop,

23
Volunteers / Re: October 2020 Work Reports
« on: October 10, 2020, 09:53:28 PM »
After James left Alna Center. Two more tresses were installed. One at a time, on the East end of the pavilion. That leaves 4 more tresses to install. They will be installed one at a time.

dwight

24
Volunteers / Re: September 2020 Work Reports
« on: September 06, 2020, 03:41:22 PM »
Hi Stephen, On the main line switch, Check for two or three switch ties that are two high. Ties need to be removed and cribs lowered. The high ties is what makes it hard to get the rails to set in place when moving the rails.till later, dwight

25
Mike did find a second hornet nest, shaped like they should be built.
 We found no birds nests.

26
Work and Events / Re: Car Barn Extension - Official Work Thread
« on: May 25, 2020, 06:01:57 PM »
Roger, Just in front of the large doorway is a buried septic tank. Plan is to have a lawn in front of the exhibit barn.

27
Volunteers / Re: February 2020 Work Reports
« on: February 02, 2020, 12:43:27 PM »
I believe work was done on the new coach frame beams.

28
Work and Events / Re: West Springfield, MA Railroad Show
« on: January 13, 2020, 04:09:08 PM »
I  can also be at WW&F tables at 2:30 on Friday.

29
Work and Events / Re: B&SR Tank 14 - Official Restoration Thread
« on: December 29, 2019, 11:37:30 PM »
Paul, SOCONY stands for Standard Oil Company Of New York

30
Work and Events / Re: B&SR Tank 14 - Official Restoration Thread
« on: December 01, 2019, 03:31:35 PM »
Later last Saturday Fred applied the first coat of wood preserver to the two long beams. Will apply a second coat during the week. The long beams will be put on flat car after the tank is painted and mounted.