1
Volunteers / Re: November 2022 Work Reports
« on: December 01, 2022, 08:26:57 AM »
From the track crews point of view, I'd like to see each tamper have its own skate, #52 have 1 long and 1 short handle skate and maybe stage a skate at AC and TOM inside Prebble. We can always use more trigs, we seem use them up on a regular basis and what some brakeman are using for a substitute is unacceptable or useless and dangerous.

2
Volunteers / Re: November 2022 Work Reports
« on: November 30, 2022, 06:52:46 PM »
Work completed Tuesday and Wednesday 29-30 November 2022

Tuesday:

Engine house shingling on west and east sides  (Fred, Stewart)
Passenger car truck build, 2 truck frames assembled  (Jerry, Carlos)
Locomotive #11 work session  (Gordon C, Rick)
Coach #9 assembly/ build continued (Eric, Ron)
Track crew working on pit rail, spacers set, joint bars to be welded
  (Steve Lx, Steve Lt, Brian W, Paul R, Leon, Dan, Scott, Randy)
SS clean up and dump run  (Stewart)
Locomotive #52 maintenance  (Brian W)

Wednesday:
Vacuum brakes design/build/test continues  (Jonathan, Jason Randy)
Locomotive #11 work session  (Gordon C, Rick)

Note:  Foul weather for Wednesday, heavy rains and wind.

3
Volunteers / Re: November 2022 Work Reports
« on: November 30, 2022, 10:23:44 AM »
To both builders John and Bill, the new pieces are greatly appreciated. The additional InstraTrak improves our track building ability as well as retire a few old ones. The skates are working out great specially with center block allowing the skate to be used on either side of the car. The more skates we have available saves brakeman time from hunting for the skate that you really need and it isn't any where around. Thanks guys.

4
Volunteers / Re: November 2022 Work Reports
« on: November 27, 2022, 06:31:51 PM »
Anticipated work for Tuesday and Wednesday 29-30 November 2022

*  Engine house build
*  Vacuum brakes design/test and build
*  Passenger car truck rebuild
*  Coach #9 assembly/build
*  Locomotive #11 work session
*  Service track pit rail work
*  SS clean up

5
Volunteers / Re: November 2022 Work Reports
« on: November 23, 2022, 05:42:05 PM »
Work completed on Tuesday and Wednesday 22-23 November 2022

Tuesday:
*  Train ops: Prep for Saturdays Holiday trains: Switching, test and set up.
    Loco #9   (Dan, Roger, Bill R, Brian)
    Loco #52 (Steve Lx, Steve Lt, Brian)
    Yard switches lubricated, ground support (Paul R, Elijah, Leon, Jay Barta, Randy)
*  Gift shop prep. (Cindy, Stewart, Paul R)
*  Coach 16 set up for transport  (Dan, Steve Lx, Steve Lt, Brian)
*  Passenger truck rebuild continued with work on bearings. (Carlos, Jerry, Joseph G)
*  Coach #9 assembly/build continues  ((Eric, Ron)
*  Engine house build continues  (Fred, Stewart, Zack)
*  Cemetery construction  (Randy, Brendan, Jeff Varney)
*  Archive work continues (Linda)
*  Rolling stock grease/oil  (Phil B)


Wednesday:

 I was not at the Railroad but I assumwork continued with:

Engine house build
Gift shop Prep
Saturday train op prep


Notes:    HAPPY THANKSGIVING TO YOU AND YOUR FAMILIES.

6
Volunteers / Re: November 2022 Work Reports
« on: November 20, 2022, 06:59:15 PM »
Anticipated work for Tuesday and Wednesday 22-23 November 2022

*  Locomotive # prep and test for weekend holiday trains.
*  Yard switching
*  Locomotive #52 prep for winter operations
*  Passenger car trucks rebuild  (pending)
*  Vacuum brakes  (pending)
*  Engine house build
*  Gift shop… move into Combine #14

Notes:  Happy Thanksgiving to everyone and your families
 
             Holiday trains to Sea Lyon start Saturday the 26th, if crew slots are filled up, there is always a     
             need for support staff.

7
Volunteers / Re: November 2022 Work Reports
« on: November 16, 2022, 08:37:13 PM »
Work completed Tuesday and Wednesday 15-16 November 2022

Tuesday:
*  Coach #9 assembly/build continued  (Eric, Ron)
*  Passenger car trucks rebuild continued, looked like some assembly going on (Carlos, Jerry)
*  Engine house build continues with Shingling and trim painting.  (Stewart, Fred)
*  Train Ops, Yard switching, rolling stock relocated.  (Dan, Brian W, Jay Barta, Eric)
*  Rolling stock grease/oiling  (Phil B)
*  Track crew continues work on pit rail  (Steve Lx, Paul R, Brian W, Leon, Randy, Dan)
*  Vehicle maintenance  (Jay Barta)
*  Gift shop/mail  (Cindy R)

Wednesday
*  Vacuum brakes work continues with a drilling jig for brake valves being built.  (Jonathan)

The storm today terminated outside work.

8
Volunteers / Re: November 2022 Work Reports
« on: November 13, 2022, 06:53:23 PM »
Anticipated work for Tuesday and Wednesday 15-16 November 2022

*  Passenger car Trucks rebuild
*  Vacuum brakes design/build/test
*  Coach #9 build
*  Engine House build
*  Pit Rail
*  Rail clean up
*  SS clean up

9
Work and Events / Re: Coach 9 - Official Work Thread
« on: November 11, 2022, 06:38:16 PM »
John, that looks to be a really nice stove.

10
Volunteers / Re: November 2022 Work Reports
« on: November 09, 2022, 06:58:11 PM »
Work completed Tuesday and Wednesday 8-9 November 2022

Tuesday:
*  Engine House work, windows, doors and shingles  (Brendan Stewart, Fred)
*  Passenger car truck rebuild painting frames and parts  (Carlos, Jerry)
*  Coach #9 assembly  (Eric, Ron)
*  Working everywhere (Randy)
*  Auburn machine shop with #11 cylinders  (Jason, Gordan)

Wednesday:
*  Train Ops, yard switching  (Dan, Brian W)
*  Track crew tamping north end of TB bridge  (Steve Lx, Steve Lt, Paul R, Leon, Chuck)
*  Vehicle recovery/repair, Blue tractor brought to SS  (Jay Barta)
*  Vacuum brakes design build  (Jonathan, Randy)
*  Engine house work continues  (Brendan, Fred, Stewart)
*  Locomotive #11 work  (Jason, Gordon, Rick)
*  Harsco tamper and Big Joe returned to SS  (Steve Lx, Steve Lt, Brian, Dan)

11
Volunteers / Re: November 2022 Work Reports
« on: November 06, 2022, 04:36:00 PM »
Anticipated work for Tuesday and Wednesday 8-9 November 2021

*  Locomotive #11 cylinder meeting at the machine shop in Auburn.  (Jason, Gordon)
*  Passenger trucks rebuild
*  Engine house
*  SS clean up
*  Pit rails (Wed)
*  Coach #9 assembly/build

12
Volunteers / Re: November 2022 Work Reports
« on: November 05, 2022, 08:47:23 PM »
A great job guys, the Sandy River work days has always been fun and productive.

Steve Lennox

13
Work and Events / Re: Model railroad sale during the fall work weekend
« on: November 04, 2022, 09:47:17 PM »
Well done Bill and Linda.

14
Volunteers / Re: November 2022 Work Reports
« on: November 02, 2022, 05:33:28 PM »
Work completed on Tuesday and Wednesday 1-2 November 2022

Tuesday:
*  Crews work on capping the engine house roof with plywood and then covered with ice/water shield.
    (Brendan, Steve Lx, Steve Lt, Brian W, Jay Barta, Paul Richards, Randy, Leon, Fred)
*  Passenger truck rebuild continues with priming and painting frames.  (Jerry, Carlos)
*  Coach #9 assembly continues with interior work.  (Eric, Ron)
*  Rail Car #4 work continued and builders get together.  (Paul R, Leon, Brendan)
*  Archive work continues (Linda)

Wednesday:
*  Mountain grade survey conducted  (Jonathan, Randy)
*  Engine house and various projects.  (Fred, Brendan)
*  Locomotive #3 off loaded and in for repairs

Note:  I was not at SS today so several projects/folks have been missed.

15
Work and Events / Re: Engine House - Official Work Thread
« on: November 02, 2022, 10:27:33 AM »
The people sitting on the roof is yes Randy on the right and Brian Whitney on the left. Working the ground handling material and clean up was Fred and Paul Richard.