Hey Everyone,

     The rail we'll be laying during the Work Weekend is scheduled to arrive this week so we'll need as many hands as possible on Saturday 9/13 to move it to the rail pile at the end of track.  We also have ties to move.  If we get the rail done in a timely fashion we could start moving ties.  We also have ten foot ties on the way (delievery next week?) which will need to be cut in half, treated on the cut ends, moved, etc. So, I 'm sure there will be another day dedicated to tie work prior to the work weekend. We have enough ties on hand for about 900 feet of track which means we'll need 150 more to lay all the rail. 
Title: Re: Moving Rail and Ties
Post by: Mike Fox on September 08, 2008, 08:27:54 PM
See you then. I have some oil we can use for the rail.
Title: Re: Moving Rail and Ties
Post by: Dana Deering on September 09, 2008, 08:29:56 AM
Update on ties:

     I received word from Allan that we will be getting 5 foot ties (no cutting needed!) so that wil lspeed things up.  They should arrive the week of 9/22 so we'll see you for tie moving on 9/27!
Title: Re: Moving Rail and Ties
Post by: Gordon Cook on September 09, 2008, 08:53:15 AM
I'll be there Sat. AM, around 9 or so. See you then.
Title: Re: Moving Rail and Ties
Post by: Allan Fisher on September 10, 2008, 12:44:04 PM
75 sticks of 60 lb rail unloaded, placed on Flats 118 & 126, along with joint bars, and shoved to end of track.

62 sticks of 70 lb and scrap 60 lb rail loaded on truck to go to Kovalchick for credit.

B&SR Tank moved a couple more feet from Track 7 to allow more clearance.

All done in less than three hours by our incredible forklift operator Steve Zuppa, and the rest of the WW&F's reliable OLD volunteers.
Title: Re: Moving Rail and Ties
Post by: Dave Buczkowski on September 10, 2008, 01:06:12 PM
I'm wondering why "incredible" Steve didn't bring his fork lift when we loaded the 70 lb rail. I can't imagine it's because he thought my muscles were big enough...
Dave  ;D
Title: Re: Moving Rail and Ties
Post by: Duncan Mackiewicz on September 10, 2008, 03:29:32 PM
Dave,
You underestimate Steve. I'm sure that's exactly why he left that rail for you to handle. 
Duncan
Title: Re: Moving Rail and Ties
Post by: Mike Fox on September 10, 2008, 04:41:10 PM
Glad the OLD volunteers were available. Matbe some younger ones (myself included) will help off load.
Title: Re: Moving Rail and Ties
Post by: Dana Deering on September 11, 2008, 05:56:33 AM
Hats off to the reliable OLD VOLUNTEERS and the always incredible "Two Forks" Zuppa.  Did he do it all while driving backward?  ;)  So, 75 sticks means 74 sticks that we can put down, if all are in good shape, which translates to 1,110 feet of new track.  So, I'll see the reliable younger volunteers on Saturday and we'll unload the rail and put down two sticks at the end of track so we can do any drilling to match bolt holes to the last rail at EOT to avoid having to do that on the work weekend.  Then we'll discuss moving ties.  Maybe if time allows we can move some on Saturday and the remainder on 9/27 when the others arrive.  Good job everyone!
Title: Re: Moving Rail and Ties
Post by: Dave Buczkowski on September 11, 2008, 08:12:36 AM
Is there any relation between Two Forks and Two Ties? I'm thinking Two Ties is a younger Steve Zuppa and Two Forks is an older version. Hmmm. And Duncan, you are no doubt correct. Time to go to the gym so I can keep up with the young guys.
Dave
Title: Re: Moving Rail and Ties
Post by: Wayne Laepple on September 11, 2008, 07:10:16 PM
Sounds like you need an infusion of Vitamin Y, Dave. Shall I bring some along in four weeks?
Title: Re: Moving Rail and Ties
Post by: Dave Buczkowski on September 11, 2008, 11:09:28 PM
 Dr. Wayne;
    Thanks! I could use a refill, I ran out of my prescription a few weeks ago. See you soon.
Dave
Title: Re: Moving Rail and Ties
Post by: Mike Fox on September 13, 2008, 06:11:58 PM
Never have I seen Dana so happy moving rail. Everything we handle was uniform and in excellent shape. Well we did find one with a cracked base at the end but the rest of the rail is good.And all the joint bars came with the rail. It is going to be a pleasure to work with that rail in a few weeks.
Title: Re: Moving Rail and Ties
Post by: Dana Deering on September 15, 2008, 08:37:16 AM
Yep, I was very happy.  The rail looks to be in uniformly good condition and the joint bars match the holes (boy will I miss the fun of cropping and drilling rail this fall ;))!  Now if we can get the ties moved on 9/27 we'll be in great shape for the work weekend.  Just so everyone knows, we are also getting some stone so we'll be ballasting what we put down, as crew numbers allow.  Should be a busy and productive weekend!
Title: Re: Moving Rail and Ties
Post by: Duncan Mackiewicz on September 15, 2008, 09:51:55 AM
Dana,
I hope your back is better by the work weekend.  We'd really miss your voice saying "side of the care....lift....north.....
Duncan
Title: Re: Moving Rail and Ties
Post by: Gordon Cook on September 15, 2008, 11:26:57 AM
Dana,
I hope your back is better by the work weekend.  We'd really miss your voice saying "side of the care....lift....north.....
Duncan

Actually, having experienced Dana's authoritative voice this past Saturday lining track, I'm not sure if we'll all be missing it too much by the end of the track weekend.  :)
Title: Re: Moving Rail and Ties
Post by: Mike Fox on September 15, 2008, 07:02:01 PM
And he called it when we were dragging the rail into place Saturday. Works good when you have the same person calling the shots moving rail. The same language is used every time. LIFT. NORTH. 4 FEET. 2 FEET. 1 FOOT. DOWN. SOUTH.................INSTATRACK.
Title: Re: Moving Rail and Ties
Post by: Dana Deering on September 23, 2008, 06:39:23 AM
Don't worry, my sweet voice will be working just fine, and I hope my back will be in shape for working by then, too!  This coming Saturday, 9/27, we have a tractor and trailer lined up for hauling ties.  This will allow us to stack ties at pre-measured intervals ahead of the end of track so we can lay out ties without having to send a crew back through the rail and ballast crews to get them.  If this works it will really speed up the process and prevent a lot of standing around waiting.  So I hope we have a good turnout this weekend!
Title: Re: Moving Rail and Ties
Post by: Wayne Laepple on September 24, 2008, 07:44:49 PM
Yeah, well, I'll have my earplugs at the ready in case Dana's voice gets too loud.

Two weeks from tomorrow, my wife and I will be heading north. I can't wait to see everyone and the progress that's been made since April. I hope I'm up to driving spikes. Haven't done any since last fall!
Title: Re: Moving Rail and Ties
Post by: Dave Buczkowski on September 25, 2008, 09:17:43 AM
Wayne;
   For a donation on your part to the Museum I will be glad to pound spikes in your place giving you full credit for the work done. I look forward to seeing you again. It's always nice to see everyone at the Museum.
Dave
Title: Re: Moving Rail and Ties
Post by: Duncan Mackiewicz on September 25, 2008, 09:37:49 AM
Dave,
Amen to that last line.
Duncan
Title: Re: Moving Rail and Ties
Post by: Mike Fox on September 25, 2008, 06:27:08 PM
No tie fighting this weekend :'( Too much rain in the forecast. Dana wants to do this during work weekend.
Title: Re: Moving Rail and Ties
Post by: James Patten on September 26, 2008, 05:55:56 AM
No tie fighting this weekend :'( Too much rain in the forecast. Dana wants to do this during work weekend.

However, to qualify your statement, the flatcar still needs to be emptied for the charter next Friday.
Title: Re: Moving Rail and Ties
Post by: jockellis on October 05, 2008, 10:21:56 PM
Hope the track laying days were enjoyable as well as productive. Lucky! When you have to cut ties in half, how do you treat them? Also, I hope everyone used ear protection so they didn't go deaf from the singing of "Drill, ye tarriers, drill"