Due to a change in plans, and based on our contractor's availability, a small crew (1-3 additional people) would be helpful to assist Jason at the South end of the Trout Brook Bridge site. While not critical, a couple of extra hands would be helpful.
There will be calls for crews (probably on short notice) throughout the construction season. Tomorrow's crew is not critical, so there is no need to "drop everything". That said, a couple of extra hands would be helpful.
If you arrive after the crew has departed, please park at the 218 crossing and hike into the bridge site.
-
Please move the yellow WW&F barricade and pull down the grade. Park on the side before the dozer and road cloth. It could be soft where the cloth is. Thursday only. Jeff will deliver gravel Friday. After Friday, parking on that side for the whole length of it. It will give someone a chance to get out, and not be blocked in. Please, no vehicles beyond the pile of brush unless dropping off or working from.