I don't know about this winter...Zack only wants to get the roof up, he figures there won't be time to board up the walls. If he does and we can take down the plywood over the old doors, Bays 2 and 3 still need their tracks jacked up 2-3 inches to meet up with the track from the concrete. Seems the west side of the building/track sunk that much over time.