Was at the museum today. Went to the end of the line and counted rail lenths
525 feet was tamped, lined, dressed and put in service.
360 feet was tamped, but not lined, Not in service.
270 feet had gravel fill put in low spots, jacked up and shovel tamped. Still needs ballast,
Out of the log book Friday, 55 names in log book
Saterday, 78
Sunday, 52