October 2025 work reports
« on: October 01, 2025, 05:35:21 AM »
Anticipated work for Saturday Oct 4:

* First day of Pumpkin trains, with two trainsets running.  All hands needed.
* Coal storage: Mike will be placing the blocks as the walls of the coal bin.
* Engine house tweaks
* Archives

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,444
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #1 on: October 04, 2025, 04:10:24 PM »
Work done  on Saturday Oct 4:

* Coal storage bin: Mike picked up the blocks (with the forklift), and Brian W, Bryce and myself helped spot them.  The bin is ready for coal (except maybe the concrete surface has to cure for a little more time).  We had a coal delivery this past week.
* Engine house: Stewart was puttering around in it.
* Pumpkin trains: One trainset, but only going to Top of Mountain.  Loco swap at Sheepscot, between 9 and 52.  Sold out trains.
* Archives: The Archives Committee had a meeting.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,864
    • View Profile
Re: October 2025 work reports
« Reply #2 on: October 04, 2025, 05:42:12 PM »




Mike
Doing way too much to list...

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,418
    • View Profile
Re: October 2025 work reports
« Reply #3 on: October 05, 2025, 07:58:03 AM »
Looks good, Mike. Is that Bryce or Dan in the 1st photo?

Jeff
Hey Rocky, watch me pull a moose trout out of my hat.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,864
    • View Profile
Re: October 2025 work reports
« Reply #4 on: October 05, 2025, 12:12:17 PM »
Bryce in orange talking with Brian
Mike
Doing way too much to list...