Great pics.
Thanks.
Paul Uhland

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #181 on: July 23, 2016, 01:44:55 PM »
Will the excavated soil be used as fill, say, at the first mainline washout north of TOM?
Paul Uhland

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,877
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #182 on: July 23, 2016, 02:22:11 PM »
No, it's being removed.  It's pretty junky stuff.

See ya
Jason

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #183 on: July 23, 2016, 03:51:11 PM »
Too bad.
Paul Uhland

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,914
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #184 on: July 23, 2016, 04:54:03 PM »
It would make good fill where compaction wasn't an issue. Not under a building or roadbed. Going to try and use similar material in those critical areas.
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,914
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #185 on: July 24, 2016, 06:25:13 PM »
Noticed the clay tiles are still being used to support the rebar cage. These should be removed before the pour, or a void could be created, creating a weak spot in the footer. Use of rebar as a support would be much better strength wise, by driving them in as stakes and tying the rebar cages to them, or use solid bricks.
Mike
Doing way too much to list...

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #186 on: July 24, 2016, 11:49:54 PM »
Mike...As former rebar detailer, special metal spacer 'chairs' are made for rebar to sit on , especially in slabs.
Definitely pull out those hollow pipe tiles, replace with at least 2" thick solid bricks to keep rebar up inside the concrete to properly reinforce and help keep it consolidated if cracking occurs.

Um...finally read a note on the rebar placement plan: minimum coverage--3 inches.
So there.  ;)
« Last Edit: July 26, 2016, 11:31:29 AM by Paul Uhland »
Paul Uhland

Terry Harper

  • Baggageman
  • **
  • Posts: 117
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #187 on: July 25, 2016, 07:29:46 AM »
The rule I was taught regarding rebar cover was the rebar should be a min. of 3" from the bottom of the slab/footing
and Min. 1-1/2" in from the sides and top.

I love watching WW&F projects progress. You folks simply know how to get it done and get it done right.

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #188 on: July 25, 2016, 12:38:33 PM »
Terry...sounds good to me.
Paul Uhland

Dave Crow

  • Museum Member
  • Fireman
  • ****
  • Posts: 404
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #189 on: July 25, 2016, 01:33:39 PM »
American Concrete Institute (ACI) specifies 3" minimum cover to protect the rebar from water seeping in and corroding the rebar.  Any seams between concrete pours, such as between the footer and the center pedestal, are supposed to be sealed with a concrete bonding agent.

Dave Crow

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,124
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #190 on: July 25, 2016, 03:10:48 PM »
The footing was poured this afternoon.

























United Timber Bridge Workers, Local 1894, Alna, ME

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,432
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #191 on: July 25, 2016, 07:14:13 PM »
Fantastic progress. So, what is the next step?

Jeff S.
Hey Rocky, watch me pull a moose trout out of my hat.

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,034
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #192 on: July 25, 2016, 08:01:52 PM »
Build the next set of forms for the next pour.  The panels for the forms have been built, they will be set up and secured around the next stage of rebar.

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #193 on: July 26, 2016, 11:27:02 AM »
Will the thick ring stem wall be cast as a one-piece, solid unit?
Will more rebar be added?
Am assuming the turntable will be assembled in place when enough prelim work is done?
When is the next pour? IIRC, I've learned generic concrete takes 3 days to reach 50% strength, 90% in 28 days.

Love 'snoopervising' this fascinating project.  :D
« Last Edit: July 26, 2016, 08:08:09 PM by Paul Uhland »
Paul Uhland

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,914
    • View Profile
Re: Sheepscot Turntable - Official Work Thread
« Reply #194 on: July 26, 2016, 12:41:01 PM »
Paul,
The rebar that is laying at the end of track, just beyond the tie, is for the retaining wall for the TT lead, and 3 roundhouse tracks. Also, I think there was some to go across the length of the fingers.

Mike