Work done on Saturday Jan 5:
* Restrooms: the sheetrock in the men's and women's rooms are done, as is the outside hall. The interior hall (between the bathrooms) has to be done on the ceiling and on the back wall.
* #10: The engine was cleaned out, hydro'd, and then the water was dumped out.
* Gift shop: Linda and I finished up the inventorying.
* Plow: The diesel plowed out the yard, thanks to the crane car plucking the plow from the front and moving to the back, then putting back in the front.