Work done the week ending July 24.
* During the weed whacking work week, the participants were able to work on the northern part of the line from end of track to past MP 7, south of Trasks to the trestle, around Sheepscot Mills, and around Brook Crossing.
* Leon was busy during the week installing the jacks on the railcar. Saturday Jason did some welding on the frame. Later during the day the jack feet were put in and the jacking rachets put in, and the car jacked up on the feet off the rail. The turntable still needs to go it, which is going to be under the feet.
* Zack worked on moving the water line in the house which goes to the car shop from a floor rubber hose to a ceiling-mounted copper pipe, in preparation for basement floor cementing.
* Mike installed the alternator in the Lindsay compressor but it still had some significant air leaks.
* Stewart did some painting during the week, including 103's roof.