Bills location 10 is actually location 9. And his location 11is actually location 10. There used to be stakes there marking, but had been tossed aside.
Location 9, we are waiting for the permit from the Army Corps. Contractor Jeff wants to haul the material in from the access road, versus across the bridge next year. So this moves up our culvert installation to this year.. Contractor Jeff will help so we can do it quicker.
Alex, you are correct. If, and I mean if, we get location 9 and 10 done this year, there is potential to lay probably close to 1600 feet. But that depends if we can get it ready in time. 1400 feet is about half way from EOT to Trout Brook..