Author Topic: Thermit Welding on the FR-WHR Cross-Town Link  (Read 1640 times)

Ed Lecuyer

  • Administrator
  • Yardmaster
  • *****
  • Posts: 2,093
    • View Profile
    • wwfry.org
Thermit Welding on the FR-WHR Cross-Town Link
« on: January 08, 2009, 01:59:07 AM »
MODERATORS NOTE:
Thermit Welding on the FR-WHR Cross-Town Link has been converted from the pre-July 2008 WW&F Discussion Forum.
Some formatting may have been removed or modified from the original postings that appear quoted in this topic.
Information contained within this post may be superseded by more recent postings and conversations.

jlancasterd wrote:
Quote
Carillion, the contractors for the portion of the WHR Phase 4 reconstruction that actually runs through Porthmadog, have finally got to the stage of laying track - using the special tramway-type rail sourced from Austria (for the past several months they have been busy doing things like moving water mains out of harm's way, and constructing 'protection' for Porthmadog's main sewer, which runs under or near the route for several hundred yards).
Yesterday they actually laid some rails and welded two sections together using the Thermit process - a very spectacular operation:
http://www.l-camera-forum.com/leica-forum/technology-industry/51404-thermit-welding.html
_________________
Editor
Ed Lecuyer
Moderator, WW&F Forum