Tentative schedule will be as follows..
11/14 Install blocks between the ends of the trusses, fascia board, metal drip edge and the rest of the bracing.
11/27 and 11/28. If the weather is good for both days and can get enough help, I'd like to get the roof installed. It may not take both days, but I think it will.
December. Siding.. And a good clean up of the remaining wood. Lots of it would make good fire starter..