8:58, first side done. Brian and I were screwing while Zack, Dwight and Fred lugged lumber.
09:51. Next side was finished, just in time for a presidential inspection..
Before 10:30, we had moved the crane into position and set the group.
Slowly bringing it together.
Zack on the left, Fred center and Dwight on the right waiting..
25 feet up..
End of the day. Braced and secured.